Skip to main content
ICRAvoidance / ReductionBRACM0002

MS RENOVÁVEIS WIND POWER COMPLEX: MAR E TERRA, AREIA BRANCA, EMBUACA AND ICARAÍ, BY AES BRASIL

ICR-47 ↗

#116of 1935 in Renewable energy#1of 154 in Intl. Carbon Registry (ICR)#83of 1287 in ACM0002

6.6/ 10
Integrity
7.0
Transparency
6.5
Claim Safety
6.0
Documentation
7.0

Audit Analysis

A four-farm wind power project in Brazil verified under ICR/ACR with a jurisdictional grid-emission-factor baseline and VVB-confirmed additionality. The project delivered roughly 34% of its pro-rata ex-ante expectation for the six-month monitoring period, which is low but partially explainable by wind variability. No buffer pool is documented, and a minor inconsistency in leakage treatment between the monitoring and verification reports warrants attention.

Red Flags

  • Verified ERR of 23,129 tCO2 represents only ~34% of the pro-rata ex-ante expectation (~67,944 tCO2) for the six-month monitoring period, suggesting the lifetime estimate may be optimistic or the period was unusually low-wind.
  • Leakage treatment is described as 'quantified' in the verification report but 'not addressed' in the monitoring report — a documentation inconsistency that weakens confidence in the 0% deduction.

Credit Vintages

IssuedRetiredAvailable
2013
67,781067,781
2014
136,1930136,193
2015
128,6750128,675
2016
134,8070134,807
2017
117,5660117,566
2018
116,6910116,691
2019
108,7010108,701
2020
119,5260119,526
2021
133,1590133,159
2022
74,231074,231
2023
23,326023,326
Total1,160,65601,160,656

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

avoidance project

Leakage

0% with quantified justification (wind)

Baseline

Jurisdictional grid EF (2020)

Safeguards

FPIC, grievance mechanism, benefit sharing

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents