MS RENOVÁVEIS WIND POWER COMPLEX: MAR E TERRA, AREIA BRANCA, EMBUACA AND ICARAÍ, BY AES BRASIL
#116of 1935 in Renewable energy#1of 154 in Intl. Carbon Registry (ICR)#83of 1287 in ACM0002
Audit Analysis
A four-farm wind power project in Brazil verified under ICR/ACR with a jurisdictional grid-emission-factor baseline and VVB-confirmed additionality. The project delivered roughly 34% of its pro-rata ex-ante expectation for the six-month monitoring period, which is low but partially explainable by wind variability. No buffer pool is documented, and a minor inconsistency in leakage treatment between the monitoring and verification reports warrants attention.
Red Flags
- Verified ERR of 23,129 tCO2 represents only ~34% of the pro-rata ex-ante expectation (~67,944 tCO2) for the six-month monitoring period, suggesting the lifetime estimate may be optimistic or the period was unusually low-wind.
- Leakage treatment is described as 'quantified' in the verification report but 'not addressed' in the monitoring report — a documentation inconsistency that weakens confidence in the 0% deduction.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 67,781 | 0 | 67,781 | |
| 2014 | 136,193 | 0 | 136,193 | |
| 2015 | 128,675 | 0 | 128,675 | |
| 2016 | 134,807 | 0 | 134,807 | |
| 2017 | 117,566 | 0 | 117,566 | |
| 2018 | 116,691 | 0 | 116,691 | |
| 2019 | 108,701 | 0 | 108,701 | |
| 2020 | 119,526 | 0 | 119,526 | |
| 2021 | 133,159 | 0 | 133,159 | |
| 2022 | 74,231 | 0 | 74,231 | |
| 2023 | 23,326 | 0 | 23,326 | |
| Total | 1,160,656 | 0 | 1,160,656 |
Risk Indicators
VVB-confirmed combined test
avoidance project
0% with quantified justification (wind)
Jurisdictional grid EF (2020)
FPIC, grievance mechanism, benefit sharing
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →