6.3/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
6.5
Documentation
6.0

Audit Analysis

The MSA-1 Hydropower Plant is a grid-connected renewable energy project in Chile with a sound core methodology (VVB-verified investment test additionality, jurisdictional baseline, appropriately negligible leakage). However, documentation gaps around safeguards (no FPIC or grievance mechanism recorded), a baseline-method contradiction between the validation and monitoring reports, and four outstanding corrective actions on report completeness temper the overall assessment. The project is under-delivering relative to its pro-rata ex-ante expectation, which is conservative from a claim-safety standpoint.

Red Flags

  • Baseline method is characterised as 'jurisdictional' in the 2023 monitoring report but as 'project' in the 2020 validation report — the discrepancy is unresolved in the extracted record.
  • No free, prior and informed consent (FPIC) or grievance mechanism is documented in any available source, despite safeguards being broadly mentioned.
  • Four corrective actions remain open, all relating to missing sections in the monitoring and verification reports (emission-trading disclosure, socio-economic impacts, communications mechanism, SD contributions).
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.

Credit Vintages

IssuedRetiredAvailable
2018
10,0631,9668,097
2019
8,0705,6062,464
2020
2,0862,0860
2021
6,9016,9010
2022
9,4179,4170
2023
5,4915,4910
Total42,02831,46710,561

Risk Indicators

Additionality

VVB-verified investment test

Permanence

mixed evidence / unresolved risk

Leakage

0 % deduction, justified as negligible

Baseline

Jurisdictional per monitoring report; contradicted by validation report

Safeguards

Mentioned but no FPIC or grievance mechanism documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03AMS-I.D., Grid connected renewable electricity generation

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents