MSR-X: Verified Polymer Substitution Emission Reductions
CMARK-5
#6of 7 in Netherlands#3of 7 in Carbonmark (CMARK)
Audit Analysis
The XTokenz plastics recovery and recycling project in the Netherlands has a named VVB (Control Union UK) and a 10% buffer pool, but the record is missing critical integrity parameters: the baseline method is not stated in any document, additionality verification by the VVB is unconfirmed, and the leakage justification is contradictory between the PDD and the methodology. The exact match between claimed and verified ERR (18,892.86 tCO₂e) raises questions about independent verification depth.
Red Flags
- Baseline method is not stated in any available document (PDD, methodology, or verification report), leaving the reference scenario for the 18,892.86 tCO₂e claim unverified
- Leakage justification is contradictory: the PDD (2025) describes it as 'quantified' while the methodology (2025-10-25) describes it as 'deemed negligible', yet the deduction is 0% in both cases
- Claimed and verified ERR are identical (18,892.86 tCO₂e), suggesting the VVB may have confirmed the project's own calculation without independent adjustment
- Additionality test type is listed as 'combined' but VVB confirmation of the test is not recorded in the extracted data
Credit Vintages
No issuances recorded on the registry.
Il marketplace dichiara i vintage: 2025 (non verificato).
Risk Indicators
Combined test stated but VVB confirmation not recorded
reversal events not confirmed absent
0% deduction with contradictory justifications (quantified vs. negligible)
Baseline method not stated in any document
Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not stated
CORSIA and CCP status both not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →