A VCS-registered BSF-rearing compost project in India with VVB-confirmed additionality and a standardized methodology (AMS-III.F v12.0), but significant gaps in permanence safeguards (reversal events not addressed, no buffer pool), a contradictory 0% leakage justification, and two open forward actions. The project delivered exactly the claimed 7,335 tCO₂e for its first monitoring period, though the PDD had initially estimated 12,134 tCO₂e before validation reduced the figure by roughly 40%.
Red Flags
- Reversal events are explicitly 'not addressed' in the verification report, and no buffer pool percentage is stated — a material permanence gap for a compost project where the product can decompose
- Leakage justification is contradictory: the monitoring report (Dec 2022) describes it as 'quantified' while the validation report (Dec 2024) describes it as 'deemed negligible', yet the deduction is 0% in both cases
- Two Forward Action requests remain open: maintenance of aerobic conditions to comply with the methodology, and issuance of an RFP document post-2027 for the crediting period
- The PDD (Apr 2023) estimated 12,134 tCO₂e while the validation report (Dec 2024) confirmed only 7,335 tCO₂e — a 40% reduction that signals initial over-estimation in the project design
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 1 | 0 | 1 | |
| 2022 | 1 | 0 | 1 | |
| Total | 2 | 0 | 2 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, contradictory justification
Project-specific, modeled baseline
Grievance mechanism present, no FPIC
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →