Multi-Species Reforestation in Mato Grosso, Brazil
#40of 261 in Soil carbon#42of 211 in Brazil#414of 1339 in Verra (VCS)#15of 97 in AR-ACM0003
Audit Analysis
A long-running (21-year) multi-species reforestation project in Mato Grosso with VVB-verified additionality and a 12% buffer pool, but significant documentation quality issues (29 corrective actions, multiple calculation errors) and a notable gap in free, prior and informed consent. The project delivered only about 26% of its pro-rata ex-ante expectation, indicating a conservative (under-crediting) posture that reduces over-crediting risk but raises questions about baseline calibration.
Red Flags
- FPIC was not conducted despite the project operating in Mato Grosso, Brazil, where indigenous and traditional land rights are a material concern
- 29 corrective actions were identified across verification cycles, including sampling bias in plot selection, SOP inconsistencies, and multiple calculation formula errors
- Achieved emissions reductions were 50% lower than ex-ante estimations, suggesting the project-specific baseline was overly optimistic
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 1999 | 118,878 | 115,920 | 2,958 | |
| 2009 | 258,975 | 228,873 | 30,102 | |
| 2015 | 2,496 | 2,352 | 144 | |
| 2016 | 14,976 | 0 | 14,976 | |
| 2017 | 14,976 | 0 | 14,976 | |
| 2018 | 14,976 | 0 | 14,976 | |
| 2019 | 14,976 | 0 | 14,976 | |
| 2020 | 13,728 | 0 | 13,728 | |
| Total | 453,981 | 347,145 | 106,836 |
Risk Indicators
VVB-confirmed combined test
12% buffer, no reversals, medium risk class
0% deduction, VVB-confirmed negligible
Project-specific, ex-ante overestimated by 50%+
Grievance mechanism present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →