MultiAntioquia

ECO-26 ↗

#8of 80 in ARR (afforestation)#32of 124 in Colombia#29of 99 in CerCarbono (CC)

5.4/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
6.0

Audit Analysis

MultiAntioquia is a 2,764-hectare multi-species plantation project in Colombia's Andean and Atlantic zones, verified by ICONTEC under the CerCarbono standard. Additionality is VVB-confirmed and a 15% buffer pool addresses permanence, but the project-specific baseline, a 0% leakage deduction across four departments, and several unresolved data contradictions (unit errors in ERR figures, conflicting baseline and reversal-event descriptions) limit confidence in the integrity and transparency of the claims.

Red Flags

  • 0% leakage deduction justified only as 'deemed negligible' for a 2,764 ha project spanning four departments (Antioquia, Córdoba, Caldas, Sucre) with no quantified boundary analysis
  • Contradiction in reversal-event reporting: the verification report (2023-05-05) states non-permanence is 'not addressed' while an earlier version (2023-03-17) reports 'none reported' — the later, more conservative reading is privileged
  • Unit/formatting error in the claimed ERR figure (43.356 vs 43,356 tCO2e) within the same verification report, indicating data-quality weaknesses in the reporting chain
  • Baseline method is project-specific rather than jurisdictional, and the baseline has not been reassessed since project inception (2011), with no reassessment date recorded
  • FPIC was not conducted and no grievance mechanism is documented, despite the project involving smallholder landowners across four departments

Credit Vintages

IssuedRetiredAvailable
2010
7220722
2011
9890989
2012
6530653
2013
6880688
2014
3,19103,191
2015
2,92202,922
2016
1,81601,816
2017
1,26801,268
2018
9480948
2019
5460546
2020
2,10602,106
2021
2,10102,101
2022
1,75001,750
Total19,700019,700

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

15% buffer present; reversal status inconsistent

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific; no reassessment recorded

Safeguards

Mentioned but contradictory; no FPIC or grievance mechanism

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents