Skip to main content
VCSAgriculture Forestry and Other Land UseColombia Registry: RegisteredVM0006

Mutatá REDD+ Project

VCS-1399 ↗

#87of 261 in Soil carbon#61of 124 in Colombia#721of 1339 in Verra (VCS)#6of 10 in VM0006

5.0/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

The Mutatá REDD+ project has the core structural elements of a credible VCS ALM project — VVB-verified additionality, a 10% buffer pool, a quantified 20% leakage deduction, and no reported reversals — but is undermined by an extensive list of material findings (over 30 items), 33 corrective actions, and a project-specific baseline with no documented reassessment. Pro-rata delivery of approximately 81% of the ex-ante expectation for the 2018–2019 monitoring period indicates no over-crediting, though the volume of documentation gaps and the unresolved RENARE participation question introduce moderate claim-safety risk.

Red Flags

  • Over 30 material findings and 33 corrective actions raised during verification, including incomplete GHG emission calculations, missing market leakage calculations, and incomplete non-permanence risk reports (all subsequently closed)
  • Unclear impact of project participation under Colombia's RENARE program, raising a potential double-claiming concern
  • Project-specific baseline with no documented reassessment date; the ex-ante lifetime estimate differs by ~12.5% between the validation report (4,850,763 tCO₂e) and the PDD (4,241,776 tCO₂e)
  • CCB verification public comment period was not conducted prior to verification, a procedural gap noted in the 2024 verification report
  • Four Forward Action Requests remain open for future verification, including finalization of Maximum Mitigation Potential calculations

Credit Vintages

IssuedRetiredAvailable
2013
110,68997,05313,636
2014
1,4281,4280
2015
93,12793,1270
2016
100,002100,0020
2017
104,64619,80584,841
2018
29,00017,50011,500
Total438,892328,915109,977

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

10% buffer, no reversals, but 4 FARs open

Leakage

20% quantified deduction

Baseline

Project-specific, no reassessment date

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

RENARE impact unclear; CORSIA/CCP not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09VM0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents