Myanmar Satoketayar Solar Power Plant Project
#788of 1935 in Renewable energy#6of 25 in Myanmar#476of 1339 in Verra (VCS)#618of 1287 in ACM0002
Audit Analysis
The Myanmar Satoketayar Solar Power Plant is a straightforward renewable energy avoidance project with a VVB-verified combined additionality test and a jurisdictional baseline, but the available record contains no monitoring data, no buffer pool specification, and two outstanding corrective actions related to CDM tool versions. The low extraction confidence and absence of a monitoring report limit the ability to verify actual emissions reductions against the ex-ante estimate of 161,098 tCO₂e.
Red Flags
- No monitoring period or monitoring report found in the extracted record; the verified ERR figure (161,098) is identical to the claimed figure, suggesting it is the ex-ante estimate rather than a post-monitoring verification
- Two corrective actions remain open: justification of CDM tool-24 applicability and application of the latest CDM tool-27 (v13.0) with revised IRR benchmark
- Low extraction confidence across the document set reduces reliability of the extracted data
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified combined test
Avoidance project
0% deemed negligible, consistent with solar
Jurisdictional, grid EF 0.35133 (2016)
Grievance mechanism and benefit sharing present; FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →