Skip to main content
GSEnergy Efficiency - DomesticMyanmarGeneral Methodologyv2.1

Myanmar Stoves Campaign - Soneva in Myanmar - VPA No. 018

GS-3648 ↗ · current registry ID: GS11644

#552of 1329 in Industrial#12of 25 in Myanmar#861of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.5
Documentation
4.5

Audit Analysis

The Soneva Myanmar cookstove project is a Gold Standard energy-efficiency avoidance project with a quantified 5% leakage deduction and a named VVB (SustainCERT), but it is undermined by a critical contradiction in which the verification report does not confirm additionality (contradicting the earlier validation report), a project-specific baseline with no stated reassessment, and an extensive list of 30+ corrective actions and 14 material findings indicating significant calculation and documentation errors. The project over-delivered relative to its pro-rata ex-ante expectation (181%), which is positive for claim safety, but the reliability of the underlying data is questionable given the numerous corrections.

Red Flags

  • Additionality was confirmed at validation (2023) but NOT confirmed at verification (2024) — the more recent verification report states additionality was not verified by the VVB, creating a fundamental gap in the additionality chain.
  • 30+ corrective actions were required, including corrections to baseline calculations, emission reduction formulas, DFn values, and survey methodology — indicating the project's own calculations contained material errors.
  • FPIC was not conducted, despite the project operating in Myanmar with local communities as end-users.
  • Crediting period dates differ between the validation report (2022-2027) and the monitoring report (2021-2026), creating uncertainty about the actual project timeline.

Credit Vintages

IssuedRetiredAvailable
2021
2,97802,978
2022
6,39306,393
Total9,37109,371

Risk Indicators

Additionality

Barrier test present but not confirmed at verification stage

Permanence

mixed evidence / unresolved risk

Leakage

5% quantified deduction applied

Baseline

Project-specific baseline, no reassessment date stated

Safeguards

Grievance mechanism and benefit-sharing present, but FPIC not conducted

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents