Myanmar Stoves Campaign - Soneva in Myanmar - VPA No. 018
GS-3648 ↗ · current registry ID: GS11644
#552of 1329 in Industrial#12of 25 in Myanmar#861of 1801 in Gold Standard (GS)
Audit Analysis
The Soneva Myanmar cookstove project is a Gold Standard energy-efficiency avoidance project with a quantified 5% leakage deduction and a named VVB (SustainCERT), but it is undermined by a critical contradiction in which the verification report does not confirm additionality (contradicting the earlier validation report), a project-specific baseline with no stated reassessment, and an extensive list of 30+ corrective actions and 14 material findings indicating significant calculation and documentation errors. The project over-delivered relative to its pro-rata ex-ante expectation (181%), which is positive for claim safety, but the reliability of the underlying data is questionable given the numerous corrections.
Red Flags
- Additionality was confirmed at validation (2023) but NOT confirmed at verification (2024) — the more recent verification report states additionality was not verified by the VVB, creating a fundamental gap in the additionality chain.
- 30+ corrective actions were required, including corrections to baseline calculations, emission reduction formulas, DFn values, and survey methodology — indicating the project's own calculations contained material errors.
- FPIC was not conducted, despite the project operating in Myanmar with local communities as end-users.
- Crediting period dates differ between the validation report (2022-2027) and the monitoring report (2021-2026), creating uncertainty about the actual project timeline.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 2,978 | 0 | 2,978 | |
| 2022 | 6,393 | 0 | 6,393 | |
| Total | 9,371 | 0 | 9,371 |
Risk Indicators
Barrier test present but not confirmed at verification stage
mixed evidence / unresolved risk
5% quantified deduction applied
Project-specific baseline, no reassessment date stated
Grievance mechanism and benefit-sharing present, but FPIC not conducted
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →