Skip to main content
GSEnergy Efficiency - DomesticMyanmarGeneral Methodologyv2.1

Myanmar Stoves Campaign

GS-1498 ↗ · current registry ID: GS1729

#639of 1329 in Industrial#14of 25 in Myanmar#970of 1801 in Gold Standard (GS)

4.9/ 10
Integrity
5.2
Transparency
4.8
Claim Safety
5.0
Documentation
4.5

Audit Analysis

The Myanmar Stoves Campaign is a Gold Standard cookstove efficiency project with a VVB-verified investment additionality test and a conservative national-default FNRB, but it lacks a buffer pool, reports a 0% leakage deduction that contradicts an earlier 5% figure in the PDD, and has no verified emission-reduction data available for comparison. The project carries a moderate number of unresolved corrective actions related to stakeholder consultation, and the absence of FPIC documentation and end-use tracking limits confidence in the integrity and transparency of the credit claims.

Red Flags

  • Leakage deduction reduced from 5% (2016 PDD) to 0% (2023 validation report) with only a 'quantified' justification — no quantified figure is actually provided in the extracted record
  • No buffer pool or permanence mechanism identified for a 5-year crediting period with no reversal-event data
  • No verified emission-reduction data (total ERR verified) found in any available document, making over- or under-delivery unverifiable
  • 12 unresolved corrective actions at validation, many concerning stakeholder consultation documentation and process sequencing
  • FPIC status not stated in any available document despite the project operating in Myanmar with local community beneficiaries

Credit Vintages

IssuedRetiredAvailable
2015
8,0688,0680
2016
31,73729,1542,583
2017
21,40021,3973
2018
45,72545,70718
2019
83,33281,1102,222
2020
75,54251,12824,414
2021
65,6644,79160,873
2022
57,199057,199
2023
1,14301,143
Total389,810241,355148,455

Risk Indicators

Additionality

VVB-verified investment test

Permanence

reversal data absent

Leakage

0% deduction; contradicts earlier 5%; no quantified figure

Baseline

Project-specific; no reassessment date recorded

Safeguards

Grievance mechanism present; FPIC not documented; 12 corrective actions

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents