Nanchang Zhonglan Huanneng Technical Service Co. Ltd. Maiyuan LFG Power Generation Project
#406of 1084 in China#477of 1339 in Verra (VCS)#34of 159 in ACM0001
Audit Analysis
A registered VCS landfill gas power generation project in China with VVB-confirmed additionality and no reversal events, but undermined by a 0% leakage deduction with inconsistent justification across documents, a project-specific baseline, and a notable contradiction on whether gas capture is legally required. The ERR figures are internally consistent for the current monitoring period, and the project is not CORSIA-eligible, reducing double-claiming risk.
Red Flags
- Leakage deduction of 0% with the verification report stating leakage was 'not addressed' while the monitoring report claims it was 'quantified' — the justification is inconsistent across the two most recent documents
- Contradiction on whether landfill gas capture is legally required: the PDD (2020) states it is, while the monitoring report (2025) states it is not — if legally required, additionality would be fundamentally undermined
- Grid emission factor of 0.6063 tCO2/MWh is from 2017 and has not been updated in the available record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 205,042 | 132,751 | 72,291 | |
| 2021 | 243,289 | 209,294 | 33,995 | |
| 2022 | 56,190 | 49,343 | 6,847 | |
| 2024 | 2,000 | 100 | 1,900 | |
| Total | 506,521 | 391,488 | 115,033 |
Risk Indicators
VVB-confirmed but capture-legality contradiction
mixed evidence / unresolved risk
0% deduction, justification inconsistent across docs
Project-specific, measured, not yet due for reassessment
FPIC, grievance mechanism, benefit sharing documented
Not CORSIA-eligible; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →