Novocarbo Ruhr/Tyssenkrupp
#6of 61 in Biochar#1of 7 in Germany#21of 111 in Puro.earth (PUR)
Audit Analysis
The Novocarbo Ruhr/Tyssenkrupp biochar project demonstrates a solid additionality case (investment test confirmed by bio.inspecta AG) and a 14% buffer pool, but four material findings from the 2024 verification report — including an unverifiable supplier chain, inconsistent carbon-content data, and a significant LCA distance discrepancy (394 km vs. 1,184 km) — raise meaningful over-crediting risk. Several key parameters (leakage deduction, usage rates, baseline reassessment date, CORSIA/CCP status) are absent from the extracted record, limiting confidence in the net credit figure.
Red Flags
- LCA transport distance to end consumer is 394 km in the project document but 1,184 km per Google Maps — a ~3× discrepancy that could materially inflate the net credit
- The verification report (2024-09-25) could not establish a clear link between the certificate holder and the end supplier UMWELTKONTOR, undermining the chain-of-custody claim
- Carbon content from a less-accurate pilot-stage analysis was used instead of the lower, more reliable post-pilot value, potentially overstating sequestration
- FNRB method is contradictory within the same verification report: listed as both 'not applicable' and 'local field', making the 0.86 value's derivation unclear
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 339 | 339 | 0 | |
| 2024 | 12 | 12 | 0 | |
| Total | 351 | 351 | 0 |
Risk Indicators
Investment test, VVB-confirmed, no legal obligation
14% buffer, 100-yr claim, no reversal data
Quantified justification, no specific % stated
Project-specific, no reassessment date
Mentioned but FPIC and grievance undocumented
CORSIA and CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →