Vai al contenuto principale
PUR removal Norway Documentazione completa General Methodology v2.0

OBIO Rudshøgda

PUR-727586 ↗

4.0 / 10
Integrity
4.2
Transparency
3.6
Claim Safety
5.0
Documentation
2.6

Score Breakdown

Integrity

verified The verification report reports no material findings.

missing Leakage and permanence controls (buffer contribution and any reversal events) are not found in the extracted record.

Transparency

verified A VVB is identified (EnergyLink Services Pty Ltd) and a monitoring period is specified (2024-04-01 to 2025-09-30).

missing Key MRV outputs (claimed vs verified removals) and key parameters (e.g., usage monitoring) are not found in the extracted record.

Claim Safety

verified The project is explicitly not CORSIA-eligible, reducing certain double-claiming/eligibility marketing risks.

missing Over-crediting risk cannot be well assessed because verified removals and leakage treatment are not found in the extracted record.

Documentation

missing Minimum extraction confidence is low, indicating at least one key document was poorly readable.

missing A corrective action request is listed in the verification report, and the evidence document list is not specific (shown as “unknown”).

Detailed Analysis

Integrity

The verification report (dated 2025-12-31) indicates an investment additionality test is used, but it does not confirm additionality by the VVB, which weakens additionality robustness. The baseline is described as project-specific, and the timing of any baseline reassessment is not found in the extracted record, increasing baseline uncertainty. Permanence-related controls (buffer pool contribution) and any reversal events are not found in the extracted record, and leakage deduction/justification are also not found, limiting confidence in net removals.

Transparency

The verification report identifies the VVB (EnergyLink Services Pty Ltd) and provides a monitoring period (2024-04-01 to 2025-09-30). However, the extracted record does not include claimed or verified total removals for the period, preventing an independent sense-check of issuance quantities. A corrective action request in the verification report (“Biochar in stock”) suggests monitoring/controls required improvement, which reduces MRV transparency.

Claim Safety

The project is explicitly not CORSIA-eligible, which lowers the risk of CORSIA-related claims. CCP status is not found in the extracted record, so buyers cannot easily infer alignment with CCP-style quality screens. Because leakage treatment and verified removals are not found in the extracted record, there is elevated uncertainty around over-crediting risk for public claims.

Documentation

Although 9 documents were used, the evidence document list is not specific (shown as “unknown”), and the minimum extraction confidence is low, indicating readability/parse issues that reduce reliability. The verification report (2025-12-31) includes a corrective action request, which signals documentation and control gaps that should have been addressed. Contradictions across documents (safeguards mention and crediting period dates) further weaken documentation confidence.

Overall

Two contradictions materially affect confidence. First, safeguards are shown as both mentioned and not mentioned across documents (2025-12-31 vs 2023-05-08); I privilege the later-dated 2025-12-31 record as more recent, but the inconsistency reduces trust and lowers documentation/transparency scores. Second, the crediting period is inconsistent (2023-01-01 to 2024-03-31 vs 2021-01-01 to 2025-12-31); I privilege the more specific bounded period (2023-01-01 to 2024-03-31) because it is precise and dated (2024-07-16), but the discrepancy suggests registry/document control issues and increases claim risk. Note: per gate rules, documentation below 3.0 would cap transparency post-scoring.

Audit Analysis

This biochar removal project has some basic integrity signals (a stated investment additionality test and no material findings reported), but key quantifications needed to judge over-crediting risk are missing from the extracted record. Documentation reliability is weakened by low extraction confidence, a corrective action request, and contradictions across documents.

Project Description

Oplandske Bio is a Norwegian bioenergy company from the Opland and central region. They operate district, local and process heat operations based on renewable bioenergy from the region. Oplandske Bio built the first industrial-scale pyrolysis plant in Norway at Rudshøgda in the municipality of Ringsaker. The biochar manufacturing facility sells steam as a bi-product to a large meat processing facility located adjacently. The facility was purpose-built and is very modern and highly automated. The woodchips that are used as feedstock are sourced from a nearby forestry company and are PEFC certified. The transport distance to the facility is less than 2km. The production facility attained the EBC sustainable biochar certification this year. The biochar has a very high carbon content, 92%, each dry ton of biochar contains 3,36 tonnes of CO2. A lifecycle assessment (LCA) of Oplandkse Bio’s production process was carried out by Accend in September 2021. The LCA accounts for all process emissions from harvesting of the wood, chipping, transport of woodchips to the production site, and the manufacturing of the biochar on site and confirms that 3 tonnes of CO2 are stored for every 1 ton of biochar. Biochar from Oplandske is used in numerous commercial and research applications including animal litter, feed a well as urban applications such as replacing concrete.

Red Flags

  • Additionality is stated as an investment test but is not confirmed by the VVB in the verification report.
  • Leakage treatment (deduction and justification) is not found in the extracted record for a biochar project.
  • Corrective Action Request on “biochar in stock” suggests MRV/control weaknesses relevant to storage/issuance timing.
  • Contradictory statements on whether safeguards are mentioned, and conflicting crediting period dates across documents.

Credit Vintages Exhausted

Issued Retired Available
2022
621 621 0
2023
1,215 1,215 0
2024
428 428 0
2025
1,063 1,063 0
Total 3,327 3,327 0

Cosa migliorerebbe questo punteggio

  • Publish/clearly extract the claimed and verified net removals for the monitoring period, including leakage deductions and justification, and any uncertainty/QA results from the verification report.
  • Clarify and reconcile the crediting period and safeguards documentation across project documents/registry, and document permanence controls (e.g., buffer contribution, storage/stock controls) and closure of the corrective action request.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

Investment test stated, not VVB-confirmed

Permanence

Buffer/reversal info not evidenced

Leakage

Leakage treatment not evidenced

Baseline

Project-specific baseline; reassessment unclear

Safeguards

Safeguards inconsistently documented

Double-claim

Not CORSIA-eligible; CCP status unclear

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti