Skip to main content
GSWindTurkeyACM0002

ODEMIS WPP

GS-235 ↗ · current registry ID: GS1383

#187of 295 in Turkey#624of 1801 in Gold Standard (GS)#772of 1287 in ACM0002

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

The ODEMIS WPP is a Gold Standard wind project in Turkey with VVB-confirmed additionality and no reversal events, but it carries a heavy burden of 8 material findings and 29 corrective actions that raise concerns about data quality and documentation rigour. The project over-delivered relative to its pro-rata expectation (~151%), which is positive for claim safety, yet the 31% gap between claimed and verified emission reductions and eight cross-document contradictions temper confidence in the underlying numbers.

Red Flags

  • Eight material findings in the verification report, including inconsistencies in energy generation values, project start date (2014 vs 2016), turbine commissioning date, and capital investment figures
  • 29 corrective actions required, spanning PDD template version, ER calculations, SDG reporting, and stakeholder consultation documentation
  • Claimed emission reductions (217,691 tCO₂e per the 2025 verification report) exceed verified reductions (150,844 tCO₂e) by roughly 31%, a gap that requires explanation
  • Leakage justification is contradictory: the 2025 verification report states 'quantified' while the 2023 verification report states 'deemed negligible', yet the deduction is 0% in both cases
  • Baseline method is contradictory: the 2025 verification report says 'project' while the 2025 monitoring report says 'jurisdictional'

Credit Vintages

IssuedRetiredAvailable
2018
25,11825,1180
2019
59,72859,7280
2020
58,02631,41226,614
2021
72,966072,966
2022
66,127066,127
2023
65,514065,514
2024
54,129054,129
Total401,608116,258285,350

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal events

Leakage

0% deduction, justification contradictory across reports

Baseline

Project-specific, method contradicts monitoring report

Safeguards

Grievance mechanism and benefit sharing present, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents