OKA 2 PROJECT
#108of 261 in Soil carbon#806of 1339 in Verra (VCS)#40of 97 in AR-ACM0003
Audit Analysis
The Oka 2 Project is a VCS ALM soil-carbon project in the DRC with a confirmed investment-test additionality and a 15% buffer pool, but it carries significant integrity concerns including an unaddressed permanence risk around Acacia mangium final-cut loss, an unreported methodology deviation in ex-ante ERR calculation, and a 0% leakage deduction deemed negligible for a soil-carbon context. The project delivered roughly 26% of its pro-rata ex-ante expectation for the elapsed monitoring period, suggesting conservative crediting but also questioning the robustness of the original baseline estimate. Extensive material findings (17 items) and corrective actions (17 items) were raised and closed during verification, indicating a project that required substantial remediation before issuance.
Red Flags
- No evidence provided that Acacia mangium carbon stocks will not be lost due to a final cut, a critical permanence gap for a soil-carbon project
- Unreported methodology deviation in the ex-ante GHG ERR calculation identified during verification
- Leakage deduction of 0% deemed negligible for a soil-carbon project in the DRC, with the justification downgraded from 'quantified' in the validation report to 'deemed negligible' in the verification report
- Conflicting information regarding the displacement of pre-project agricultural activities undermines baseline integrity
- Project-specific baseline rather than a jurisdictional or standardised approach, with no documented baseline reassessment date
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 1,829 | 0 | 1,829 | |
| 2021 | 4,393 | 0 | 4,393 | |
| 2022 | 4,393 | 0 | 4,393 | |
| 2023 | 3,669 | 0 | 3,669 | |
| Total | 14,284 | 0 | 14,284 |
Risk Indicators
Investment test confirmed by VVB
Buffer pool present but A. mangium final-cut risk unaddressed
0% deduction deemed negligible for soil carbon
Project-specific baseline; reassessment not yet due
FPIC and grievance mechanism present but consultation evidence unclear
CORSIA and CCP statuses not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →