Ordu Landfill Gas to Electricity Project
#56of 189 in Methane#197of 295 in Turkey#665of 1339 in Verra (VCS)#51of 159 in ACM0001
Audit Analysis
The Ordu Landfill Gas to Electricity Project is a registered VCS project with VVB-confirmed additionality and appropriate safeguards, but its credit calculations are undermined by a significant ex-ante error (based on only two engines rather than total installed capacity), a GWPCH4 source error, and 24 material findings requiring corrective action. The project-specific baseline, contradictory leakage justifications within the same monitoring report, and the absence of FNRB, CORSIA, and CCP documentation create moderate over-crediting and transparency risks.
Red Flags
- Ex-ante EGPJ,y calculated on only two engines instead of total installed capacity of 53,025 MWh, invalidating the lifetime ex-ante estimate
- GWPCH4 value sourced from IPCC AR6 instead of the required AR5, with parameters Pn and Tn missing
- 24 material findings and 24 corrective actions identified by the VVB, including inconsistent waste characterization values and EGEC,y figures not matching EPIAS/TEIAS records
- Leakage justification is internally contradictory within the same monitoring report (stated as both 'quantified' and 'deemed negligible')
- PDD dated 2023-03-13 post-dates the project start date of 2021-06-24, raising questions about the validation timeline
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 3,700 | 3,700 | 0 | |
| 2022 | 275 | 272 | 3 | |
| Total | 3,975 | 3,972 | 3 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deduction with contradictory justifications
Project-specific measured baseline, no reassessment timing
FPIC, grievance mechanism, and safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →