Skip to main content
GSOtherNepalAMS-III.F

Organic waste composting in Kathmandu Valley

GS-139 ↗ · current registry ID: GS1229

#792of 1329 in Industrial#82of 101 in Nepal#1185of 1801 in Gold Standard (GS)#31of 43 in AMS-III.F

4.7/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.5
Documentation
3.5

Audit Analysis

This Gold Standard composting project in Kathmandu Valley was verified by SustainCERT and delivered 144% of its pro-rata ex-ante expectation for the monitoring period, which is encouraging. However, the verification process surfaced 27 material findings and corrective actions—ranging from GWP value errors to inconsistent waste-quantity figures—indicating a weak MRV discipline. The absence of a stated buffer pool, a project-specific modeled baseline with no documented reassessment, and the non-conduct of FPIC leave meaningful gaps in integrity and safeguards.

Red Flags

  • 27 material findings and 27 corrective actions were raised by the VVB, including substantive errors in GWP values (AR4 vs AR5), inconsistent methane-capture parameter 'f', and discrepancies in the quantity of waste composted (Qy) between the monitoring report and the ER spreadsheet.
  • FPIC was not conducted, despite the project operating in a community setting in Kathmandu Valley.
  • The leakage justification is contradictory across two monitoring reports (one says 'deemed negligible', the other 'quantified'), and the 0% deduction lacks a robust, consistent justification for a composting operation.
  • Baseline is project-specific and modeled, with no documented reassessment date, and the crediting period itself is inconsistent between two monitoring reports (2014-07-01 vs 2014-01-01 start).

Credit Vintages

IssuedRetiredAvailable
2014
28280
2015
2312283
2016
6676670
2017
1,1361,1360
2018
2,3142,046268
2019
3,1772,187990
2020
4,0882,8281,260
2021
1,7871,561226
Total13,42810,6812,747

Risk Indicators

Additionality

VVB-confirmed under AMS-III.F

Permanence

no reversal data

Leakage

0% deduction; contradictory justification

Baseline

Project-specific, modeled; no reassessment date

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05AMS-III.F

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents