Organic waste composting in Kathmandu Valley
GS-139 ↗ · current registry ID: GS1229
#792of 1329 in Industrial#82of 101 in Nepal#1185of 1801 in Gold Standard (GS)#31of 43 in AMS-III.F
Audit Analysis
This Gold Standard composting project in Kathmandu Valley was verified by SustainCERT and delivered 144% of its pro-rata ex-ante expectation for the monitoring period, which is encouraging. However, the verification process surfaced 27 material findings and corrective actions—ranging from GWP value errors to inconsistent waste-quantity figures—indicating a weak MRV discipline. The absence of a stated buffer pool, a project-specific modeled baseline with no documented reassessment, and the non-conduct of FPIC leave meaningful gaps in integrity and safeguards.
Red Flags
- 27 material findings and 27 corrective actions were raised by the VVB, including substantive errors in GWP values (AR4 vs AR5), inconsistent methane-capture parameter 'f', and discrepancies in the quantity of waste composted (Qy) between the monitoring report and the ER spreadsheet.
- FPIC was not conducted, despite the project operating in a community setting in Kathmandu Valley.
- The leakage justification is contradictory across two monitoring reports (one says 'deemed negligible', the other 'quantified'), and the 0% deduction lacks a robust, consistent justification for a composting operation.
- Baseline is project-specific and modeled, with no documented reassessment date, and the crediting period itself is inconsistent between two monitoring reports (2014-07-01 vs 2014-01-01 start).
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 28 | 28 | 0 | |
| 2015 | 231 | 228 | 3 | |
| 2016 | 667 | 667 | 0 | |
| 2017 | 1,136 | 1,136 | 0 | |
| 2018 | 2,314 | 2,046 | 268 | |
| 2019 | 3,177 | 2,187 | 990 | |
| 2020 | 4,088 | 2,828 | 1,260 | |
| 2021 | 1,787 | 1,561 | 226 | |
| Total | 13,428 | 10,681 | 2,747 |
Risk Indicators
VVB-confirmed under AMS-III.F
no reversal data
0% deduction; contradictory justification
Project-specific, modeled; no reassessment date
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →