OYU – Fuelling a Brighter Future in Tanzania VPA01
GS-4742 ↗ · current registry ID: GS13087
#554of 1329 in Industrial#6of 19 in Tanzania#864of 1801 in Gold Standard (GS)
Audit Analysis
The OYU cookstove project in Tanzania has VVB-verified additionality and no reversal events, but is weighed down by an unusually large number of material findings (over 30), a project-specific baseline, and a contradiction indicating FPIC was not conducted. The verified emissions reductions (69,851 tCO₂e) exceed the pro-rata expectation for the three-month monitoring period by roughly 3.3×, which reduces over-crediting risk but raises questions about the accuracy of the ex-ante estimate. Governance clarity around multiple implementing entities remains a persistent concern across documents.
Red Flags
- FPIC contradiction: the 2026 validation report states FPIC was not conducted, while the 2023 PDD claims it was; the more recent and authoritative validation report is privileged, leaving a safeguards gap
- Over 30 material findings and 25+ corrective actions identified by the VVB, including missing implementer agreements, unclear entity roles/ownership, and incomplete distribution databases
- Fuel stacking (charcoal/coal use alongside improved cookstoves) observed during the VVB's onsite visit, indicating the baseline scenario may not fully reflect actual household behaviour
- Nine cross-document contradictions in key parameters (lifetime ER, claimed/verified ER, fNRB method, leakage deduction, usage rate), reducing confidence in the consistency of the project record
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Energy efficiency; no reversals
5% quantified deduction
Project-specific; fuel stacking observed
Grievance present; FPIC not conducted
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →