Vai al contenuto principale
VCS Agriculture Forestry and Other Land Use Canada Registry: Registered Documentazione completa General Methodology v2.0

Painted Forest Carbon Project

VCS-3812 ↗

5.7 / 10
Integrity
6.2
Transparency
5.5
Claim Safety
5.0
Documentation
5.8

Score Breakdown

Integrity

verified Additionality confirmed by the VVB (verification report, 2025-08-06).

missing Project uses a project-specific baseline (methodology VM0012 v1.2) and baseline reassessment date not stated, increasing baseline risk.

Transparency

verified VVB named (Aster Global Environmental Services, verification report) and monitoring period stated (2021-09-02 — 2022-12-31).

missing Key MRV figures are not present in the extracted record (verified and claimed ERR not stated), and extraction confidence is only medium.

Claim Safety

verified Leakage quantified with a 17.2% deduction and described as quantified in the monitoring/verification documents.

missing CORSIA/CCP eligibility not stated and baseline is project-specific, leaving material over-crediting risk uncertain.

Documentation

verified Multiple supporting documents listed (verification report, monitoring report, validation report, stakeholder consultation) and 14 documents used.

inferred Extraction confidence is medium and there are contradictions between monitoring and verification reports (FPIC, grievance, reversals), reducing documentary reliability.

Detailed Analysis

Integrity

Additionality was explicitly confirmed by the VVB in the verification report (Aster Global, 2025-08-06), and the project applies VM0012 v1.2 with a 12% buffer pool and a 17.2% leakage deduction — all positive for permanence and leakage treatment. However, the baseline is project-specific (methodology noted as project) and the baseline reassessment date is not stated in available documents, which weakens baseline validity. Contradictory records about reversals (monitoring report indicates reported reversals; verification report later indicates none) reduce confidence in the project's reversal history and monitoring reliability.

Transparency

The verification report names the VVB and the monitoring period is provided, and evidence documents are listed (verification, monitoring, validation, stakeholder consultation). However, many quantitative MRV outputs are missing from the extracted record: claimed and verified emissions reductions are not stated, the net extraction/err figures are absent, and some monitoring methods are not described. Extraction confidence is medium, which further lowers transparency.

Claim Safety

Leakage is treated and justified (17.2% deduction, stated as quantified), which reduces immediate over-crediting risk. Nonetheless the project relies on a project-specific baseline rather than a jurisdictional standard, and eligibility for CORSIA/CCP is not stated; both increase the risk of contestable claims. Contradictions in reported reversals and stakeholder safeguards also raise greenwashing risk.

Documentation

There are multiple documents (n=14) including a verification report dated 2025-08-06 and a monitoring report; the project record lists stakeholder consultation and validation. Min extraction confidence is medium, and there are unresolved contradictions between monitoring and verification documents (FPIC, grievance mechanism, reversals). No material findings or corrective actions were extracted, which is positive, but the contradictions and some missing MRV numbers lower the documentation score.

Overall

I privileged the verification report (verification_report, 2025-08-06) where documents disagree because it is the later, higher-priority assurance document: for FPIC and grievance mechanism the verification report states they were not conducted/present while the monitoring report (2025-07-31) says they were; I treated the verification report as authoritative but flagged the contradiction as a reliability concern. For reversals, the monitoring report (2024-12-30) indicates reported reversals while the verification report (2025-08-06) states none reported; I privileged the verification report but reduced scores to reflect the inconsistency in the record. For the additionality test type, monitoring documentation lists a common-practice test and an unknown document suggested an investment test; because the VVB confirmed additionality in the verification report I privileged the VVB confirmation but note the inconsistency. These contradictions and the medium extraction confidence reduce overall confidence and keep the overall quality in the moderate range (5.7/10).

Audit Analysis

Moderate integrity: additionality was confirmed by the VVB and leakage is quantified with a substantial deduction, but project-specific baseline and contradictions about reversals and FPIC reduce confidence. Documentation exists (multiple reports, VVB named) but key metrics like reported vs verified emissions and some monitoring details are missing or contradictory. Claim risk is moderate due to project baseline, unknown CORSIA/CCP status, and extraction uncertainties.

Project Description

Proponent: Perimeter Forest Limited Partnership Protocol categories: Agriculture Forestry and Other Land Use Protocols: VM0012 Estimated annual GHG reductions: 94169 tCO2e Region: North America Registration date: 2025-10-16

Red Flags

  • Contradictory evidence on whether reversals were reported (monitoring report vs verification report).
  • Contradictory/unclear stakeholder safeguards (FPIC and grievance mechanism): monitoring report indicates they exist, verification report denies them.

Credit Vintages

Nessuna emissione registrata sul registro.

Cosa migliorerebbe questo punteggio

  • Resolve contradictions between monitoring and verification reports (explicitly document FPIC, grievance mechanism, and any reversal events) and republish reconciled reports.
  • Publish complete MRV figures including claimed vs verified emission reductions, baseline reassessment date, and clear statement on CORSIA/CCP eligibility.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed

Permanence

buffered but reversal uncertainty

Leakage

quantified deduction

Baseline

project-specific baseline

Safeguards

partially documented / contradictory

Double-claim

CORSIA/CCP status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-23 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti