Skip to main content
GSA/RPanamaGeneral Methodologyv2.1

Panama Tropical Reforestation

GS-4067 ↗ · current registry ID: GS11899

#42of 80 in ARR (afforestation)#9of 11 in Panama#1465of 1801 in Gold Standard (GS)

4.3/ 10
Integrity
4.0
Transparency
4.5
Claim Safety
4.0
Documentation
5.0

Audit Analysis

This Gold Standard tropical reforestation project in Panama has a verified additionality test, a 20% buffer pool, and no reported reversals, but is burdened by ten open corrective actions concerning fundamental biomass and soil-carbon calculation methodology, multiple contradictions in ERR figures across documents, and a project-specific baseline with no stated reassessment date. The verified 79,027 tCO₂e for the 2024 monitoring period represents roughly 6× the linear pro-rata expectation from the 540,335 tCO₂e lifetime ex-ante estimate, a ratio that is difficult to reconcile without the calculation-methodology concerns raised in the CARs being fully resolved.

Red Flags

  • Ten corrective actions remain open, including justification of biomass stock calculation (diameter-only vs. allometric equation with height), SOC calculation with no monitoring parameter in the PDD, and appropriateness of the volume equation used for ex-post calculation
  • Contradictions in ERR figures: the verification report states 79,027 tCO₂e verified while the monitoring report states 98,784 tCO₂e, and the claimed figure differs between 79,027 (VR) and 135,146 (MR)
  • Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis, while an appendix characterises leakage as 'quantified' — an unresolved inconsistency
  • Stakeholder consultation non-compliance with the 30-day invitation period (Rule 3.4.2) was noted, with a deviation request approved to mitigate
  • The reversal-events detail reads 'There is no reversal of GHG benefits…for non-forest projects,' which is boilerplate language inappropriate for an A/R project and does not substantively address forest carbon-stock reversal risk

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

20% buffer pool, no reversals

Leakage

0% deduction, thin justification

Baseline

Project-specific, no reassessment date

Safeguards

Grievance & benefit-sharing present; FPIC not stated; consultation non-compliance noted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-11General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents