Panama Tropical Reforestation
GS-4067 ↗ · current registry ID: GS11899
#42of 80 in ARR (afforestation)#9of 11 in Panama#1465of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard tropical reforestation project in Panama has a verified additionality test, a 20% buffer pool, and no reported reversals, but is burdened by ten open corrective actions concerning fundamental biomass and soil-carbon calculation methodology, multiple contradictions in ERR figures across documents, and a project-specific baseline with no stated reassessment date. The verified 79,027 tCO₂e for the 2024 monitoring period represents roughly 6× the linear pro-rata expectation from the 540,335 tCO₂e lifetime ex-ante estimate, a ratio that is difficult to reconcile without the calculation-methodology concerns raised in the CARs being fully resolved.
Red Flags
- Ten corrective actions remain open, including justification of biomass stock calculation (diameter-only vs. allometric equation with height), SOC calculation with no monitoring parameter in the PDD, and appropriateness of the volume equation used for ex-post calculation
- Contradictions in ERR figures: the verification report states 79,027 tCO₂e verified while the monitoring report states 98,784 tCO₂e, and the claimed figure differs between 79,027 (VR) and 135,146 (MR)
- Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis, while an appendix characterises leakage as 'quantified' — an unresolved inconsistency
- Stakeholder consultation non-compliance with the 30-day invitation period (Rule 3.4.2) was noted, with a deviation request approved to mitigate
- The reversal-events detail reads 'There is no reversal of GHG benefits…for non-forest projects,' which is boilerplate language inappropriate for an A/R project and does not substantively address forest carbon-stock reversal risk
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Combined test, VVB-confirmed
20% buffer pool, no reversals
0% deduction, thin justification
Project-specific, no reassessment date
Grievance & benefit-sharing present; FPIC not stated; consultation non-compliance noted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →