Panna Afforestation and Reforestation Project
#61of 261 in Soil carbon#436of 975 in India#547of 1339 in Verra (VCS)
Audit Analysis
The Panna afforestation project in India has a VVB-confirmed investment additionality test and a generous buffer pool (~22.6% of lifetime credits), but the validation report lists 12 material findings touching on baseline consistency, carbon pool exclusions, and non-permanence risk scoring. The project is in its early validation stage with no monitoring data yet, and several key parameters (leakage percentage, FNRB, CORSIA eligibility) remain unstated, limiting the ability to fully assess claim safety.
Red Flags
- 12 material findings in the validation report, including inconsistencies in baseline emissions, carbon pool exclusion justification, and non-permanence risk scoring, yet no corrective actions were formally required
- Reversal events are listed as 'not addressed' in the extracted record despite the project being an afforestation scheme with inherent non-permanence risk
- Leakage is described as 'quantified' in the justification but no specific deduction percentage is stated in any available document
- Two different lifetime ERR figures appear across PDD revisions (116,023 vs 151,899), a ~23% discrepancy that, while resolved in the later revision, signals baseline sensitivity
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Buffer present but reversal events not addressed
Quantified justification but no specific % stated
Project-specific; reassessment not yet due
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →