Panzhou County Chicken Farm Manure Composting Project
#220of 1329 in Industrial#358of 1084 in China#417of 1339 in Verra (VCS)#12of 43 in AMS-III.F
Audit Analysis
A VCS-registered chicken manure composting project in China using the simplified AMS-III.F methodology, with VVB-confirmed combined additionality and no material findings. However, the project-specific modeled baseline, absence of a stated buffer pool, a 0% leakage deduction with contradictory justifications across monitoring reports, and a significant grid emission factor discrepancy (0.486 vs 0.774) introduce moderate over-crediting and data-reliability concerns.
Red Flags
- Grid emission factor contradiction: the 2024-10-24 monitoring report uses 0.7738 tCO2e/MWh while the 2025-03-15 monitoring report uses 0.48595 tCO2e/MWh — a 37% difference that materially affects the avoidance calculation
- Leakage justification shifted from 'quantified' (monitoring report, 2024-11-12) to 'deemed negligible' (monitoring report, 2025-03-15) with a 0% deduction, raising questions about whether leakage was actually assessed
- No buffer pool percentage or permanence claim is stated in any available document, leaving reversal risk unquantified for a 10-year crediting period
- FNRB value, FNRB method, usage monitoring method, and carbon content testing are all absent from the extracted record, limiting independent verification of the 37,793 tCO2e claim
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 2,336 | 349 | 1,987 | |
| 2024 | 2,000 | 6 | 1,994 | |
| Total | 4,336 | 355 | 3,981 |
Risk Indicators
Combined test, VVB-verified
mixed evidence / unresolved risk
0% deduction, justification inconsistent across reports
Project-specific, modeled; reassessment not yet due
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →