Skip to main content
CCLand use (AFOLU)ColombiaGeneral Methodologyv2.1

Pedeguita y Mancilla REDD+

ECO-99 ↗

#43of 99 in REDD+#65of 124 in Colombia#51of 99 in CerCarbono (CC)

5.0/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

The Pedeguita y Mancilla REDD+ project has a VVB-verified additionality test, a jurisdictional baseline, and a 10.7% combined buffer pool, but is undermined by 17 verification findings (including a double-counting concern), multiple contradictions between documents on baseline method, leakage, and buffer percentage, and a low extraction confidence rating. Pro-rata delivery is adequate (~103% of expectation), but the shift from a 10% leakage deduction at validation to 0% at verification, combined with unresolved community-participation and sampling-bias issues, creates meaningful over-crediting risk.

Red Flags

  • SAC 02 identifies potential double counting with the Jiguamiandó project; the PDD was updated to remove the Jiguamiandó reference, but the underlying boundary overlap risk warrants ongoing monitoring.
  • Leakage deduction dropped from 10% (validation report, Dec 2022) to 0% (verification report, Nov 2024) with only a 'quantified' justification; the monitoring report separately characterises leakage as 'deemed negligible', creating an inconsistency in how leakage is treated.
  • Baseline method is stated as 'jurisdictional' in the 25 Nov 2024 verification report but as 'project' in the 19 Nov 2024 verification report — a fundamental methodological discrepancy that affects the validity of the baseline.
  • 17 verification findings (10 SAC, 5 SA, 2 SAF) remain on record, including sampling bias (plots not randomly distributed), community members lacking awareness of project documents, and missing legal certificates for three associations.
  • Minimum extraction confidence is rated 'low', indicating at least one key document was poorly readable, reducing reliability of the extracted data.

Credit Vintages

IssuedRetiredAvailable
2020
19,357019,357
2021
18,095018,095
2022
2,02902,029
2023
1,22001,220
Total40,701040,701

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

10.7% buffer, no reversals, but risk treatment inconsistent across docs

Leakage

0% deduction at verification vs 10% at validation; justification inconsistent

Baseline

Jurisdictional per latest doc, but contradicted by 'project' in earlier verification

Safeguards

FPIC conducted, grievance mechanism present, safeguards documented

Double-claim

CORSIA and CCP status not stated; dual-channel risk unassessed

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents