Perennial CN9-2 AMM FLARE PROJECT
#61of 64 in Methane#85of 115 in United States#26of 45 in American Carbon Registry (ACR)
Audit Analysis
The project follows a recognized ACR mine methane methodology and shows no material findings, but critical verification data is entirely missing from the extracted record. The absence of additionality assessments, baseline details, buffer contributions, and MRV metrics severely limits confidence in environmental integrity and claim safety.
Red Flags
- No additionality test or VVB verification details found
- Missing baseline methodology, buffer pool data, and leakage treatment
- CORSIA and CCP eligibility status not stated, raising double-counting risk
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
No assessment found
Buffer pool unaddressed
No leakage treatment
Method not stated
None documented
Status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →