Permanent Abandonment of Marginal Oil and Natural Gas Wells

ICR-370 ↗

#57of 189 in Methane#160of 345 in United States#32of 154 in Intl. Carbon Registry (ICR)

5.1/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A permanent well-abandonment methane avoidance project with a fundamentally sound design (no reversal risk, VVB-confirmed additionality, 5% buffer pool), but undermined by significant data-reliability issues including a three-fold discrepancy in the lifetime ex-ante estimate between the PDD and the validation report, a project-specific baseline, and an extensive list of initial documentation deficiencies (9 CARs, 11 CLs) that were subsequently resolved. The verified monitoring-period figure aligns closely with the PDD's pro-rata expectation, but the unresolved contradiction in the lifetime figure casts a shadow over the overall credit volume.

Red Flags

  • Lifetime ex-ante estimate differs by a factor of ~3 between the PDD (220,205 tCO2e) and the validation report (652,874 tCO2e), creating material uncertainty about the true credit volume
  • A calculation error in baseline emissions was identified during validation and corrected, and project emissions from diesel/transport were initially omitted before being included in the final quantification
  • Leakage justification is internally inconsistent within the validation report: described as 'quantified' in one section (2025-10-01) and 'deemed negligible' in another (2025-09-16), while the applied deduction is 0%
  • Stakeholder consultation was limited to landowner agreements; formal community outreach was not conducted, and the ongoing consultation plan lacked a clear schedule

Credit Vintages

IssuedRetiredAvailable
2024
7230723
2025
22,020022,020
2026
22,021022,021
2027
22,020022,020
2028
22,021022,021
2029
22,020022,020
2030
22,021022,021
2031
22,020022,020
2032
22,021022,021
2033
22,020022,020
2034
21,298021,298
Total220,2050220,205

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction reasonable for permanent abandonment

Baseline

Project-specific measured baseline, ex-ante figure disputed

Safeguards

Grievance mechanism present, FPIC not conducted, limited community outreach

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents