Üçpinar Wind Power Project, Turkey
#98of 1935 in Renewable energy#23of 295 in Turkey#34of 1339 in Verra (VCS)#67of 1287 in ACM0002
Audit Analysis
The Üçpinar Wind Power Project is a registered VCS renewable energy project with a solid combined additionality test confirmed by the VVB, a jurisdictional baseline reassessed in 2025, and no reversal events. However, the project record contains nine cross-document contradictions, 31 corrective action requests (all closed), and several key parameters (FNRB, usage monitoring, CORSIA/CCP status) remain unstated, limiting full confidence in the MRV chain.
Red Flags
- Nine contradictions across documents, including conflicting baseline method (jurisdictional vs project-specific), FPIC status (conducted vs not conducted), and benefit-sharing description (present vs absent), indicating inconsistent record-keeping over time
- 31 Corrective Action Requests raised during verification, including missing baseline calculation in the monitoring report, inconsistencies in MR values for cut-out wind speed and net electricity generation, and an undisclosed project start-date deviation
- FNRB value, usage monitoring method, CORSIA eligibility, and CCP status are all not stated in the available documents, leaving key claim-safety parameters unverified
- Grid emission factor is from 2017; no evidence of periodic grid EF updates is found in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 99,152 | 0 | 99,152 | |
| 2020 | 195,330 | 0 | 195,330 | |
| 2021 | 200,624 | 0 | 200,624 | |
| 2022 | 200,988 | 0 | 200,988 | |
| 2023 | 192,428 | 0 | 192,428 | |
| 2024 | 189,127 | 0 | 189,127 | |
| Total | 1,077,649 | 0 | 1,077,649 |
Risk Indicators
Combined test, VVB-confirmed
Wind project, no reversal risk
0% deemed negligible, reasonable for wind
Jurisdictional, reassessed 2025
FPIC and grievance present, benefit sharing not described
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →