Pittsburgh Forest Carbon Offsets
#149of 389 in United States#48of 59 in City Forest Credits (CFC)
Audit Analysis
The Pittsburgh Forest Carbon Offsets project (Buena Vista Heights Conservation Area) is a 40-year tree preservation project with VVB-verified additionality and a 10% buffer pool, but suffers from notable gaps in permanence risk management, safeguards documentation, and baseline specificity. No contradictions were found between documents, and all verification issues were closed, yet the project-specific baseline and unaddressed reversal risk (including the noted Spotted Lantern Fly infestation) limit confidence in long-term credit durability.
Red Flags
- Spotted Lantern Fly infestation described as 'heavy' in the verification report poses a material biological risk to tree preservation over the 40-year crediting period, yet no specific reversal or buffer mechanism beyond the 10% buffer pool is documented
- Reversal events are explicitly noted as 'not addressed' in the extracted record despite a 40-year permanence claim, leaving the project's long-term credit durability unverified
- Monitoring period in the extracted record reads as a zero-length interval (2020-06-30 to 2020-06-29), suggesting a data extraction or reporting error that undermines confidence in the MRV timeline
- No FPIC, grievance mechanism, or safeguards documentation was found in any of the five available documents
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 5,635 | 0 | 5,635 | |
| 2021 | 5,635 | 0 | 5,635 | |
| 2022 | 2,696 | 9,457 | -6,761 | |
| Total | 13,966 | 9,457 | 4,509 |
Risk Indicators
VVB-verified combined test
mixed evidence / unresolved risk
Quantified but deduction pct not stated
Project-specific, reassessment timing unknown
Stakeholder consultation exists; FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →