Positive Climate Care 3.55 MW bundled Grid connected Wind Power Project Activity in Jaisalmer, Rajasthan, India
#157of 1935 in Renewable energy#71of 975 in India#60of 1339 in Verra (VCS)#51of 806 in AMS-I.D
Audit Analysis
A straightforward 3.55 MW grid-connected wind project in Rajasthan with a VVB-confirmed investment additionality test, jurisdictional baseline, and no permanence risk. The 2023 verification report confirms 16,380 tCO₂e over the full monitoring period with all material findings resolved, though minor contradictions in leakage justification language and unreported CORSIA/CCP status introduce modest uncertainty.
Red Flags
- Leakage justification is described as 'quantified' in the 2023 verification report but 'deemed negligible' in the 2023 monitoring report — a language inconsistency that, while not changing the 0% deduction, weakens the audit trail
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 5,742 | 5,617 | 125 | |
| 2009 | 5,316 | 5,136 | 180 | |
| 2010 | 3,904 | 3,904 | 0 | |
| 2011 | 4,288 | 4,288 | 0 | |
| 2012 | 4,142 | 3,755 | 387 | |
| 2013 | 2,910 | 0 | 2,910 | |
| 2014 | 3,590 | 0 | 3,590 | |
| 2015 | 3,237 | 0 | 3,237 | |
| 2016 | 2,880 | 0 | 2,880 | |
| 2017 | 3,376 | 0 | 3,376 | |
| Total | 39,385 | 22,700 | 16,685 |
Risk Indicators
VVB-confirmed investment test
Wind project, N/A risk stated
0% deduction, justification language inconsistent
Jurisdictional, grid EF 0.9062
Grievance mechanism present, FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →