Skip to main content
VCSEnergy industries (renewable/non-renewable sources)India Registry: RegisteredAMS-I.D

Positive Climate Care 3.55 MW bundled Grid connected Wind Power Project Activity in Jaisalmer, Rajasthan, India

VCS-500 ↗

#157of 1935 in Renewable energy#71of 975 in India#60of 1339 in Verra (VCS)#51of 806 in AMS-I.D

6.5/ 10
Integrity
7.0
Transparency
6.0
Claim Safety
6.5
Documentation
6.5

Audit Analysis

A straightforward 3.55 MW grid-connected wind project in Rajasthan with a VVB-confirmed investment additionality test, jurisdictional baseline, and no permanence risk. The 2023 verification report confirms 16,380 tCO₂e over the full monitoring period with all material findings resolved, though minor contradictions in leakage justification language and unreported CORSIA/CCP status introduce modest uncertainty.

Red Flags

  • Leakage justification is described as 'quantified' in the 2023 verification report but 'deemed negligible' in the 2023 monitoring report — a language inconsistency that, while not changing the 0% deduction, weakens the audit trail
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2008
5,7425,617125
2009
5,3165,136180
2010
3,9043,9040
2011
4,2884,2880
2012
4,1423,755387
2013
2,91002,910
2014
3,59003,590
2015
3,23703,237
2016
2,88002,880
2017
3,37603,376
Total39,38522,70016,685

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind project, N/A risk stated

Leakage

0% deduction, justification language inconsistent

Baseline

Jurisdictional, grid EF 0.9062

Safeguards

Grievance mechanism present, FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03AMS I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents