A captive-use solar PV project by Ecopetrol with a confirmed investment additionality test and jurisdictional baseline, but significant gaps in safeguards (no FPIC, no grievance mechanism), unaddressed leakage, and a large volume of material findings and corrective actions. The verified emissions reductions for the first monitoring period (14,404 tCO2e) represent only about 18% of the pro-rata lifetime expectation, indicating the ex-ante estimate may be overly optimistic. Multiple contradictions between documents, particularly on safeguards and leakage treatment, reduce confidence in the project's overall robustness.

Red Flags

  • 24 material findings and 16 corrective actions identified in the verification report, including missing meter calibration data for 12 days of operation and inconsistent grid emission factors across documents
  • Safeguards are effectively absent: FPIC not conducted, no grievance mechanism, and no benefit-sharing arrangement described, per the validation and verification reports
  • Leakage deduction of 0% with justification listed as 'not addressed' in the verification report, despite the validation report claiming it was 'deemed negligible'
  • Verified emissions reductions (14,404 tCO2e) are only ~18% of the pro-rata annual expectation derived from the 1,596,005 tCO2e lifetime ex-ante estimate, suggesting the lifetime projection may be significantly inflated
  • Nine contradictions between documents on key fields including additionality test type, FPIC status, safeguards, leakage treatment, and grid emission factor

Credit Vintages

IssuedRetiredAvailable
2019
2,1882,1880
2020
12,216012,216
Total14,4042,18812,216

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project; reversals 'not applicable'

Leakage

0% deduction; justification 'not addressed'

Baseline

Jurisdictional baseline method

Safeguards

No FPIC, no grievance mechanism, no benefit sharing

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AMS-I.F. Renewable electricity generation for captive use and mini-grid. V 3.0.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents