Project Activity for Local Improved Cookstoves in Bamako
GS-492 ↗ · current registry ID: GS2744
#388of 1329 in Industrial#3of 5 in Mali#627of 1801 in Gold Standard (GS)#71of 189 in AMS-II.G
Audit Analysis
A Gold Standard improved-cookstove project in Mali with a VVB-verified combined additionality test and a quantified 5% leakage deduction, but undermined by numerous material findings, eleven outstanding corrective actions, and unresolved inconsistencies in the fuel net replacement baseline value and claimed emission reductions across documents. The project's core design is sound, yet data-quality and reporting-compliance issues create meaningful uncertainty around the verified reduction figures.
Red Flags
- Three different fNRB values appear across documents (0.63 in the 2021 verification report, 0.53 in the 2024 monitoring report, and 0.6868 requested in corrective actions), creating uncertainty about the correct baseline emission factor and the resulting reduction magnitude.
- Claimed ERR of 6,357 tCO₂e in the 2024 verification report conflicts with 9,376 tCO₂e in the 2023 monitoring report — a 32% discrepancy that is not explained in the extracted record.
- Eleven corrective actions remain open, including missing Gold Standard transition annexes, absent sampling-methodology details, and an incorrect monitoring-report form version, indicating the verification cycle was not fully closed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 407 | 0 | 407 | |
| 2015 | 1,723 | 0 | 1,723 | |
| 2016 | 6,797 | 0 | 6,797 | |
| 2017 | 7,540 | 0 | 7,540 | |
| 2018 | 8,053 | 0 | 8,053 | |
| 2019 | 9,117 | 0 | 9,117 | |
| Total | 33,637 | 0 | 33,637 |
Risk Indicators
Combined test, VVB-verified
mixed evidence / unresolved risk
5% quantified deduction
Project-specific, fNRB inconsistent across docs
Grievance & benefit sharing present; FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →