Project Akwaaba | Forest Ecosystem Restoration in Ghana
#179of 261 in Soil carbon#19of 21 in Ghana#1110of 1339 in Verra (VCS)
Audit Analysis
Project Akwaaba is a soil-carbon forest restoration project in Ghana at the validation stage, with a 100-year permanence claim but no stated buffer pool, a project-specific baseline in a jurisdiction with an active Cocoa Forest REDD+ program, and an extensive list of 24 material findings and 24 corrective actions that raise serious concerns about methodological robustness. The 20% quantified leakage deduction and VVB-confirmed additionality test are positive, but the double-counting risk and absence of a buffer pool for a century-long claim are significant integrity gaps.
Red Flags
- No buffer pool percentage stated despite a 100-year permanence claim — reversal risk (fire, pests, encroachment) is identified but no quantitative risk mitigation mechanism is documented
- Double-counting risk with the Ghana Cocoa Forest REDD+ Program is explicitly flagged in material findings; the carve-out in Section 2.1.4 of the PD is insufficiently described
- 24 material findings and 24 corrective actions at validation, including missing GHG ERR spreadsheet, insufficient leakage quantification, and inconsistencies in NPR scores — indicating the project documentation is far from robust
- Project-specific baseline in a country with an active jurisdictional REDD+ program, with no reassessment date stated and no jurisdictional alignment demonstrated
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified but material gaps in analysis
100-yr claim, no buffer pool stated
20% quantified deduction
Project-specific, jurisdictional REDD overlap
FPIC, grievance mechanism, benefit sharing documented
CORSIA/CCP not stated; jurisdictional REDD risk flagged
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →