Audit Analysis
The Itxawa REDD+ project has a structurally sound design with a jurisdictional baseline, VVB-confirmed additionality, a 7.3% buffer pool, and no reversal events. However, the initial baseline underestimated reference-region deforestation by roughly 300%, 26 findings (25 corrective actions) required four rounds of review, and one prior-consultation finding remains open, collectively undermining confidence in the robustness of the underlying assumptions. The project delivered approximately 82% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating no over-crediting but also a modest shortfall.
Red Flags
- Deforestation in the reference region was approximately 300% higher than the initial baseline estimate, indicating a significant underestimation of business-as-usual pressure that was only corrected during verification
- 6 hectares of forest were converted within the project area due to infrastructure expansion, representing a direct loss of the conservation asset
- One Future Action Request (FAR) related to the prior consultation process remains open, leaving a safeguards gap unresolved
- Multiple contradictions exist between the PDD, validation report, and verification report on baseline method, additionality test type, FPIC status, and ERR figures, reducing data reliability
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 752 | 0 | 752 | |
| 2019 | 111 | 0 | 111 | |
| 2020 | 121 | 0 | 121 | |
| 2021 | 300 | 0 | 300 | |
| 2022 | 121 | 0 | 121 | |
| 2023 | 120 | 0 | 120 | |
| Total | 1,525 | 0 | 1,525 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, 7.3% buffer, no reversals
0% deduction, justified as quantified/negligible
Jurisdictional but initial estimate ~300% low; reassessed 2023
FPIC and grievance mechanism present; 1 FAR open on prior consultation
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →