Skip to main content
VCSEnergy demand; TransportIndia Registry: RegisteredAMS-III.C

Promotion of EV Infrastructure and Emission Reduction for Sustainable transport by Continuum Research and PersistentClimate

VCS-5297 ↗

#743of 975 in India#964of 1339 in Verra (VCS)#9of 16 in AMS-III.C

4.6/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.0
Documentation
5.0

Audit Analysis

This Indian EV-charging infrastructure project under VCS has a verified first monitoring period of 1,284.51 tCO₂e, but the verification report flagged nine material findings including serious questions about additionality in a market with existing government and private EV infrastructure, unverified data sources, and inadequate double-counting safeguards. The PDD's lifetime estimate of 600,000 tCO₂e contrasts sharply with the ~2,000 tCO₂e claimed in the first 21 months, raising over-crediting concerns. Six corrective actions remain open, and the 0% leakage deduction lacks a documented justification.

Red Flags

  • Nine material findings in the verification report, including additionality questioned due to existing government and private EV charging infrastructure in India and a booming EV market with government grants
  • PDD lifetime estimate of 600,000 tCO₂e versus only 2,061 tCO₂e claimed (1,284.51 verified) in the first ~21 months — the project delivered roughly 1–2% of the pro-rata expectation, suggesting the ex-ante baseline was highly optimistic
  • Leakage deduction of 0% with justification recorded as 'not addressed' in the later monitoring report (2025-06-18), despite an earlier version (2025-06-04) stating it was 'quantified'
  • Double-counting safeguards against CDM AMS-III-C overlap were not adequately described, and the VVB raised this as a material finding
  • Monitored parameters (AFEC, MPG) relied on unverified data sources per the verification report

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed but seriously questioned

Permanence

Non-AFOLU, no reversal risk

Leakage

0% deduction, justification not addressed

Baseline

Project-specific, no reassessment date

Safeguards

FPIC and grievance present, double-counting safeguards weak

Double-claim

CORSIA/CCP not stated, CDM overlap flagged

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03VM0038, AMS-III-C, AMS-I.F

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents