Providence Forest Carbon Offsets
#112of 389 in United States#44of 59 in City Forest Credits (CFC)
Audit Analysis
The Providence urban tree-planting project has a verified combined additionality test, a jurisdictional baseline, and a 5% buffer pool, with no reversal events reported. However, the extracted record contains a material discrepancy between the validation report (777 tCO₂e) and the verification report (311 tCO₂e) for the same ERR fields, and several key parameters—leakage treatment, crediting period, and permanence claim—are absent from the available documents. The project is modest in scale (1,120 trees, ~777 tCO₂e lifetime) and the overall risk profile is moderate but hampered by data gaps.
Red Flags
- ERR figure contradiction: the validation report (2025-09-24) records 777 tCO₂e while the verification report (2025-09-23) records 311 tCO₂e for both total_err_verified and total_err_claimed; the merged record carries 777, which may conflate the ex-ante lifetime estimate with the period-specific verified figure.
- Leakage deduction and justification are entirely absent from the extracted record, leaving no documented treatment of displacement or substitution effects for an urban forestry project.
- Crediting period and permanence claim duration are not stated in any available document, making it impossible to assess the temporal scope of the carbon claim.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 78 | 0 | 78 | |
| 2025 | 311 | 78 | 233 | |
| Total | 389 | 78 | 311 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
No deduction or justification found in documents
Jurisdictional baseline method
Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →