Skip to main content
CCEnergy industriesColombiaGeneral Methodologyv2.1

Proyecto de Generación de Energía Solar Fotovoltaica El Paso

ECO-151 ↗

#1390of 1935 in Renewable energy#93of 124 in Colombia#69of 99 in CerCarbono (CC)

4.6/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.0
Documentation
3.5

Audit Analysis

A Colombian solar PV project with a fundamentally sound design (jurisdictional baseline, VVB-verified additionality, no reversal risk) but severely undermined by 27 material findings in the monitoring report, including a misidentification of the project as hydraulic, a 20%+ installed-capacity discrepancy, and an undeclared DC extension. The VVB caught these issues and required extensive corrective actions, but the volume of errors and multiple cross-document contradictions significantly erode confidence in the reported reductions.

Red Flags

  • Monitoring report v2 described the project as hydraulic rather than photovoltaic — a fundamental misidentification of the technology
  • Installed capacity discrepancy of ~20% between the monitoring report (86.2 MW) and the validation report (68 MW), plus an undeclared DC extension of the solar park
  • 27 material findings and 27 corrective actions identified by the VVB, including missing ICA, missing signed safeguards statement, and inconsistent meter calibration data
  • Leakage justification is internally contradictory within the same verification report: stated as both 'quantified' and 'deemed negligible' with a 0% deduction
  • FPIC status contradicted between the verification report (conducted) and the PDD (not conducted)

Credit Vintages

IssuedRetiredAvailable
2018
4494490
2019
66,3329,55156,781
2020
90,123090,123
2021
64,996064,996
2022
75,665075,665
2023
105,6820105,682
2024
59,623059,623
Total462,87010,000452,870

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Energy project, no reversals

Leakage

0% deduction, contradictory justification

Baseline

Jurisdictional per VVB, contradicted by issuance doc

Safeguards

FPIC and grievance present, signed statement missing

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents