Skip to main content
CCLand use (AFOLU)ColombiaGeneral Methodologyv2.1

PROYECTO REDD+ PAZCÍFICO SUR

ECO-114 ↗

#26of 99 in REDD+#20of 124 in Colombia#20of 99 in CerCarbono (CC)

5.6/ 10
Integrity
5.8
Transparency
5.2
Claim Safety
6.2
Documentation
4.8

Audit Analysis

The REDD+ Pazcífico Sur project has a sound structural design with VVB-verified additionality, a jurisdictional baseline, a 20% buffer pool, and no reported reversals. However, 34 verification findings (25 corrective actions) and multiple cross-document contradictions in baseline method, buffer pool percentage, and ERR figures significantly erode confidence in the data's internal consistency. The project over-delivered relative to its pro-rata ex-ante expectation, which is positive for claim safety, but several key transparency fields remain unreported.

Red Flags

  • 34 verification findings (25 SAC, 7 SA, 2 SAF) spanning cartography errors, rounding inconsistencies in GHG calculations, plot location bias, and unclear benefit-sharing contracts — all corrected but indicating weak initial documentation quality
  • Contradiction in baseline method: the verification report (Nov 2023) states 'jurisdictional' while the monitoring report (Aug 2023) states 'project', creating ambiguity about the actual baseline approach
  • Contradiction in buffer pool: 20% in the November 2023 verification report versus 12.5% in the August 2023 verification report — a 6-percentage-point discrepancy in a key permanence safeguard
  • Contradiction in total ERR claimed: the validation report (Aug 2023) lists 10,738,354 tCO2e while the issuance document (Aug 2023) records 3,671,289 tCO2e — a nearly 3× difference that is not explained in the extracted record
  • Leakage deduction percentage is not stated in any available document despite the justification being described as 'quantified'

Credit Vintages

IssuedRetiredAvailable
2017
2,36902,369
2018
2,93902,939
2019
2,43502,435
2020
3,56503,565
2021
3,20203,202
2022
2,30602,306
Total16,816016,816

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

20% buffer, no reversals

Leakage

Quantified but % not stated

Baseline

Jurisdictional but contradicted in monitoring report

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents