Skip to main content
CarbonMeld CarbonMeld Carbon Observatory
Tools
EN
Re-assessment pendingCCWaste handling and disposal, Energy industries, Waste handling and disposalColombiaRegistry: Registered

PRR-GEI ENTREPALMAS S.A.S

Developer: ENTREPALMAS S.A.S

ECO-76 ↗

#173of 525 in Biogas#138of 213 in Colombia#125of 164 in CerCarbono (CC)

Score from methodology v2.1 (analysis of 2 Sep 2026). Re-assessment under v2.2 pending.

Assessment

CarbonMeld document-based assessment

01020304 Overall 5.2 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Re-assessment pending · v2.1

Analysis

The Entrepalmas biogas project in Colombia has VVB-confirmed additionality and a recently reassessed (2025) project-specific baseline, and it delivered roughly 219% of its pro-rata ex-ante expectation for the 2023–2024 monitoring period, indicating conservative crediting. However, multiple methodological deviations in MRV (missing flow meters, unsynchronised SCADA, absent calibration certificates) and the absence of a buffer pool or explicit permanence mechanism weaken confidence in the integrity of the credit stream. Unit inconsistencies across issuance documents and several unresolved corrective actions further reduce transparency.

Red Flags

4 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Unlock the full analysis

On this page: the analysis of 2 Sep 2026, marked “Re-assessment pending”. Per-dimension scores, risk indicators, 4 red flags, score factors, detailed analysis, and 16 registry documents (16 analyzed).

€9+ VAT per month · card subscription, renews automatically until you cancel

Every rated project, PDF reports, API access, portfolio alerts and per-dimension scores with red-flag details in side-by-side comparisons (public-data comparison is free; fair use: 30 projects per day). Cancel any time from your account page. Crypto: $9 for one month, no automatic renewal.

Price + VAT · By subscribing or paying you accept the Terms of Use — the card subscription renews every month until you cancel; digital content, no refunds. How Premium works

Eligibility & market

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    Not published

    This registry does not publish CORSIA eligibility per project.

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: project sector

  • Paris Agreement (Article 6)

    Not published

    This registry does not publish Article 6 authorizations.

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Credit Vintages

IssuedRetiredAvailable
2017
5,87105,871
2018
000
2019
7,6987,6980
2020
10,05210,0520
2021
6,8936,8930
2022
7,4797,4790
2023
10,105010,105
2024
8,06208,062
Total56,16032,12224,038

Methodology versions used

The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.

  1. 2020–2022AMS-I.D v18.0current version

    monitoring report

    official page · verified on

  2. 2020–2022AMS-I.F v3.0since replaced by v5.0

    monitoring report

    official page · verified on

  3. 2020–2022AMS-III.F v12.0current version

    monitoring report

    official page · verified on

  4. 2020–2022AMS-III.H v19.0current version

    monitoring report

    official page · verified on

  5. 2023–2024AMS-I.C v21.0since replaced by v22.0

    monitoring report + verification report + issuance document

    official page · verified on

  6. 2023–2024AMS-I.D v18.0current version

    verification report + issuance document

    official page · verified on

  7. 2023–2024AMS-I.F v3.0since replaced by v5.0

    monitoring report + verification report + issuance document

    official page · verified on

  8. 2023–2024AMS-III.F v12.0current version

    monitoring report + verification report + issuance document

    official page · verified on

  9. 2023–2024AMS-III.H v19.0current version

    monitoring report + verification report + issuance document

    official page · verified on

  • AMS-I.C: Active (CDM / UNFCCC) · official page · verified on
  • AMS-I.D: Active (CDM / UNFCCC) · official page · verified on
  • AMS-I.F: Active (CDM / UNFCCC) · official page · verified on
  • AMS-III.F: Active (CDM / UNFCCC) · official page · verified on
  • AMS-III.H: Active (CDM / UNFCCC) · official page · verified on

A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.

Documents on the registry

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceGeneral Methodologyv2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →