Prymorska Wind Farm 2
#882of 1935 in Renewable energy#4of 8 in UA#22of 154 in Intl. Carbon Registry (ICR)#695of 1287 in ACM0002
Audit Analysis
Prymorska Wind Farm 2 is a CDM-registered wind avoidance project in Ukraine with a sound jurisdictional baseline and VVB-confirmed additionality, but it is burdened by eight material findings, a project site currently under occupation, the absence of a grievance mechanism, and multiple documentation gaps that collectively undermine confidence in its operational integrity and long-term verifiability.
Red Flags
- Project site is under occupation, preventing consultation with interested parties and limiting on-site verification (validation report, 2025-04-23).
- Eight material findings and eight corrective actions remain open, including inconsistent wind turbine numbers across the PDD and monitoring report, and contradictory land-lease statements.
- Grievance mechanism reported as absent in the most recent validation report (2025-04-23), contradicting an earlier report (2024-01-31) that stated one existed; FPIC was not conducted.
- Reversal/permanence risk is noted as 'not addressed' in the monitoring report, and no buffer pool percentage is stated in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 68,846 | 0 | 68,846 | |
| 2020 | 205,975 | 0 | 205,975 | |
| 2021 | 205,975 | 0 | 205,975 | |
| 2022 | 205,975 | 0 | 205,975 | |
| 2023 | 205,975 | 0 | 205,975 | |
| 2024 | 205,975 | 0 | 205,975 | |
| 2025 | 205,975 | 0 | 205,975 | |
| 2026 | 205,975 | 0 | 205,975 | |
| 2027 | 205,975 | 0 | 205,975 | |
| 2028 | 205,975 | 0 | 205,975 | |
| 2029 | 137,129 | 0 | 137,129 | |
| Total | 2,059,750 | 0 | 2,059,750 |
Risk Indicators
VVB-confirmed combined test
Reversal risk not addressed
Deemed negligible; reasonable for wind
Jurisdictional but reassessment timing not stated
No FPIC, no grievance mechanism, site under occupation
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →