No public grade applies yet
Puente Gallego Landfill gas recovery project, Gallego, Rosario, Argentina.
- Standard
- CDM
- Methodology
- AM0011 (CDM)
- Registry
- CDM-0431 ↗ · Registered
- Country
- Argentina
- Credit type
- Landfill gas
- Developer
- Aria.biz S.A
CarbonMeld's document-based rating gives Puente Gallego Landfill gas recovery project, Gallego, Rosario, Argentina. (CDM-0431) no number (No public grade applies yet): CarbonMeld read its documents, but its type of project does not yet have a public grade that applies to it on both additionality and quantification. The absence of a number says nothing about the project's quality.
Assessment
How this analysis was made
- Our method
- CarbonMeld methodology v3 · documents read on 12 Oct 2026
Evidence
Eligibility & market
Under decision 4/CMP.20 of the Parties to the Kyoto Protocol (FCCC/KP/CMP/2025/7/Add.1, paragraph 5), the submission of requests for issuance of new CERs was discontinued as of 30 June 2026; requests to transfer CERs to the Article 6.4 mechanism registry, cancellations and any other transactions in the CDM registry are discontinued as of 31 December 2026. This page keeps the project's record.
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Not published
This registry does not publish CORSIA eligibility per project.
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 5,244 | 0 | 5,244 | |
| 2008 | 26,539 | 0 | 26,539 | |
| 2009 | 45,592 | 0 | 45,592 | |
| 2011 | 74,786 | 0 | 74,786 | |
| 2012 | 54,239 | 0 | 54,239 | |
| 2013 | 36,888 | 0 | 36,888 | |
| Total | 243,288 | 0 | 243,288 |
Methodology versions used
The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.
2006–2007AM0011 v2.0since replaced by v3.0
monitoring report
official page · verified on
2007AM0011 v2.0since replaced by v3.0
monitoring report
official page · verified on
2007–2008AM0011 v2.0since replaced by v3.0
monitoring report
official page · verified on
2008AM0011 v2.0since replaced by v3.0
monitoring report
official page · verified on
2009AM0011 v2.0since replaced by v3.0
monitoring report
official page · verified on
2009–2010AM0011 v2.0since replaced by v3.0
monitoring report
official page · verified on
2010–2011AM0011 v2.0since replaced by v3.0
monitoring report
official page · verified on
2011AM0011 v2.0since replaced by v3.0
monitoring report
official page · verified on
2011–2012AM0011 v2.0since replaced by v3.0
monitoring report
official page · verified on
- AM0011: Withdrawn (CDM / UNFCCC) · replaced by ACM0001 · official page · verified on
A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at listings@carbonmeld.com.
Profile & governance
Are you the project owner?
Full analysis (free for owners)
Owners get free access to the full analysis of their own project: every rule that raised or lowered the number, with the fact and the source it rests on, the negative facts' detail and the documents read. Write to us from your organisation's email address.
hello@carbonmeld.com →Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the rating.
hello@carbonmeld.com →Report an error on this page
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Report an error on this page →Cite this page
CarbonMeld (2026). Puente Gallego Landfill gas recovery project, Gallego, Rosario, Argentina. (CDM-0431): CarbonMeld document-based analysis, methodology v3, documents read on 12 Oct 2026. https://carbonmeld.com/projects/puente-gallego-landfill-gas-recovery-project-gallego-rosario-argentina/.
The citation names the analysis by its methodology version and the day the documents were read; the page gives no number.
Similar projects
Same methodology or sector, the same registry first.
- Landfill gas extraction on the landfill Villa Dominico, Buenos Aires, ArgentinaCDM-0072
- Landfill gas recovery at the Norte III Landfill, Buenos Aires, Argentina.CDM-0260
- EnviroServ Chloorkop Landfill Gas Recovery Project.CDM-0925
- Onyx Landfill Gas Recovery Project Trémembé, BrazilCDM-0027
- Rio Azul landfill gas and utilization project in Costa RicaCDM-0037
- Central de Resíduos do Recreio Landfill Gas Project (CRRLGP)CDM-0648
- Akhangaran Landfill Gas Capture Project in TashkentCDM-2750
- Merida Municipal Solid Waste to EnergyCDM-10102
