Skip to main content
VCSAgriculture Forestry and Other Land UseCanada Registry: RegisteredVM0034

Quebec Forestry Sector Carbon Sequestration Grouped Project Pivot

VCS-1916 ↗

#150of 261 in Soil carbon#7of 12 in Canada#1012of 1339 in Verra (VCS)

4.5/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
4.0
Documentation
5.0

Audit Analysis

A VCS soil-carbon project in Quebec with VVB-verified additionality and a 10% buffer pool, but undermined by a project-specific baseline, significant under-delivery relative to the pro-rata expectation (~11.5%), and multiple contradictions across documents on leakage, FPIC, and buffer pool figures. Thirteen corrective action requests and six outstanding corrective actions during verification signal material quality concerns that temper confidence in the credit claims.

Red Flags

  • Leakage deduction is 0% in the verification report (justified as 'quantified') but 20% in the monitoring report and 'deemed negligible' in the validation report — a three-way inconsistency that undermines the leakage assessment
  • The monitoring report claims only 84,000 tCO₂e for the 2018–2022 period against a lifetime ex-ante estimate of ~12.7 million tCO₂e, meaning the project delivered roughly 11.5% of the pro-rata expectation for the elapsed period, raising questions about baseline realism
  • FPIC is reported as conducted in the verification report but not conducted in the monitoring report — a direct contradiction on a fundamental safeguard
  • The definition of 'friche' was extended to include abandoned industrial/urban land to allow broader participation, which weakens the additionality case for those parcels
  • Thirteen corrective action requests and two clarification requests were raised and closed during verification, including missing demonstration of regulatory surplus and incomplete market-leakage information

Credit Vintages

IssuedRetiredAvailable
2018
20,45417,2203,234
2020
21,68018,0003,680
2021
18,6269,1469,480
2022
2,9282,109819
Total63,68846,47517,213

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

10% buffer, no reversals, but buffer figure contradicts validation report

Leakage

0% deduction contradicted by 20% in monitoring report

Baseline

Project-specific baseline, reassessment date not stated

Safeguards

FPIC confirmed in verification but contradicted by monitoring report

Double-claim

CORSIA and CCP status both not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03VM0034

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents