Rahima Bay Sustainable Wetlands and Mangrove Conservation (RB-SWAM)
#10of 11 in Blue carbon#6of 7 in SA#120of 154 in Intl. Carbon Registry (ICR)#11of 14 in AR-AM0014
Audit Analysis
The Rahima Bay mangrove project has confirmed additionality and a 10% buffer pool, but is undermined by severe quantification inconsistencies, a 42.5% under-delivery against its own ex-ante estimate for the first monitoring period, and over 60 corrective actions flagged by the VVB. Multiple contradictions across documents—including conflicting ERR figures, buffer percentages, and FPIC status—raise serious concerns about data reliability. The project is in its earliest phase with tree biomass still unmeasurable, making current credit claims highly uncertain.
Red Flags
- Verified removals (34.4 tCO2e) are only 42.5% of the ex-ante estimate (81 tCO2e) for the first monitoring period, attributed to slow mangrove growth in arid conditions
- Tree biomass growth was non-measurable during the first verification, limiting assurance to soil organic carbon stocks only
- Over 60 corrective actions required by the VVB, including missing NDVI data, missing EIA specific to mangrove planting, inconsistent KML/area delineation, and missing data for year 2066
- Multiple internal contradictions in the validation report: ERR claimed as both 35 and 8.46 tCO2e; buffer pool as both 10% and 0.62%; reversal events as both 'none reported' and 'not addressed'
- FPIC status contradicted: the PDD states FPIC was conducted while the VVB validation report records it as not conducted
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 81 | 0 | 81 | |
| 2024 | 161 | 0 | 161 | |
| 2025 | 273 | 0 | 273 | |
| 2026 | 326 | 0 | 326 | |
| 2027 | 379 | 0 | 379 | |
| 2028 | 432 | 0 | 432 | |
| 2029 | 485 | 0 | 485 | |
| 2030 | 538 | 0 | 538 | |
| 2031 | 591 | 0 | 591 | |
| 2032 | 644 | 0 | 644 | |
| 2033 | 697 | 0 | 697 | |
| 2034 | 750 | 0 | 750 | |
| 2035 | 803 | 0 | 803 | |
| 2036 | 856 | 0 | 856 | |
| 2037 | 909 | 0 | 909 | |
| 2038 | 962 | 0 | 962 | |
| 2039 | 1,015 | 0 | 1,015 | |
| 2040 | 1,068 | 0 | 1,068 | |
| 2041 | 1,121 | 0 | 1,121 | |
| 2042 | 1,174 | 0 | 1,174 | |
| 2043 | 1,226 | 0 | 1,226 | |
| 2044 | 1,279 | 0 | 1,279 | |
| 2045 | 1,332 | 0 | 1,332 | |
| 2046 | 1,385 | 0 | 1,385 | |
| 2047 | 1,438 | 0 | 1,438 | |
| 2048 | 1,491 | 0 | 1,491 | |
| 2049 | 1,544 | 0 | 1,544 | |
| 2050 | 1,597 | 0 | 1,597 | |
| 2051 | 1,650 | 0 | 1,650 | |
| 2052 | 1,703 | 0 | 1,703 | |
| Total | 27,910 | 0 | 27,910 |
Risk Indicators
VVB-confirmed combined test
Buffer applied but biomass unmeasurable; internal contradiction on reversal treatment
0% deduction with contradictory justification in same report
Project-specific baseline; no reassessment date recorded
Grievance mechanism present; FPIC status contradicted between PDD and VVB
Not CORSIA-eligible; no CCP approval; no-double-counting declaration confirmed
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →