Rahima Bay Sustainable Wetlands and Mangrove Conservation (RB-SWAM)

ICR-190 ↗

#10of 11 in Blue carbon#6of 7 in SA#120of 154 in Intl. Carbon Registry (ICR)#11of 14 in AR-AM0014

3.2/ 10
Integrity
3.5
Transparency
3.0
Claim Safety
3.0
Documentation
3.0

Audit Analysis

The Rahima Bay mangrove project has confirmed additionality and a 10% buffer pool, but is undermined by severe quantification inconsistencies, a 42.5% under-delivery against its own ex-ante estimate for the first monitoring period, and over 60 corrective actions flagged by the VVB. Multiple contradictions across documents—including conflicting ERR figures, buffer percentages, and FPIC status—raise serious concerns about data reliability. The project is in its earliest phase with tree biomass still unmeasurable, making current credit claims highly uncertain.

Red Flags

  • Verified removals (34.4 tCO2e) are only 42.5% of the ex-ante estimate (81 tCO2e) for the first monitoring period, attributed to slow mangrove growth in arid conditions
  • Tree biomass growth was non-measurable during the first verification, limiting assurance to soil organic carbon stocks only
  • Over 60 corrective actions required by the VVB, including missing NDVI data, missing EIA specific to mangrove planting, inconsistent KML/area delineation, and missing data for year 2066
  • Multiple internal contradictions in the validation report: ERR claimed as both 35 and 8.46 tCO2e; buffer pool as both 10% and 0.62%; reversal events as both 'none reported' and 'not addressed'
  • FPIC status contradicted: the PDD states FPIC was conducted while the VVB validation report records it as not conducted

Credit Vintages

IssuedRetiredAvailable
2023
81081
2024
1610161
2025
2730273
2026
3260326
2027
3790379
2028
4320432
2029
4850485
2030
5380538
2031
5910591
2032
6440644
2033
6970697
2034
7500750
2035
8030803
2036
8560856
2037
9090909
2038
9620962
2039
1,01501,015
2040
1,06801,068
2041
1,12101,121
2042
1,17401,174
2043
1,22601,226
2044
1,27901,279
2045
1,33201,332
2046
1,38501,385
2047
1,43801,438
2048
1,49101,491
2049
1,54401,544
2050
1,59701,597
2051
1,65001,650
2052
1,70301,703
Total27,910027,910

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Buffer applied but biomass unmeasurable; internal contradiction on reversal treatment

Leakage

0% deduction with contradictory justification in same report

Baseline

Project-specific baseline; no reassessment date recorded

Safeguards

Grievance mechanism present; FPIC status contradicted between PDD and VVB

Double-claim

Not CORSIA-eligible; no CCP approval; no-double-counting declaration confirmed

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08AR-AM0014

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents