Recycling Roadways for Carbon Emission Reductions – Global Emissionairy – U.S. Project #1

VCS-3839 ↗

#237of 345 in United States#1048of 1339 in Verra (VCS)

4.4/ 10
Integrity
3.8
Transparency
4.5
Claim Safety
5.5
Documentation
3.5

Audit Analysis

This VCS construction project (VM0039, roadway recycling) has a VVB-confirmed additionality assessment and no reported reversal events, but is undermined by numerous material findings, contradictory data between the verification report and monitoring report, a 0% leakage deduction lacking clear justification, and a significant under-delivery of only ~20% of the pro-rata lifetime expectation for the elapsed monitoring period. The low extraction confidence and 12 outstanding corrective actions further erode confidence in the project's data integrity.

Red Flags

  • Project delivered only ~20% of the pro-rata lifetime expectation (21,116 tCO2e verified vs ~104,900 tCO2e expected for the 22-month monitoring period out of the 400,616 tCO2e PDD lifetime estimate), raising questions about baseline validity or project activity levels
  • 11 material findings and 12 corrective actions remain open, including insufficient evidence on double-counting avoidance with constructors and unclear additionality (FSB vs asphalt emulsion)
  • Leakage deduction of 0% with contradictory justification: the verification report states leakage was 'not addressed' while the monitoring report claims it was 'deemed negligible'
  • Additionality test type is inconsistent: the verification report identifies a 'performance' test while the monitoring report references a 'combined' test
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2021
10,5321,0799,453
2022
10,5844,2596,325
Total21,1165,33815,778

Risk Indicators

Additionality

VVB-confirmed but test type contradictory; FSB vs emulsion unresolved

Permanence

No reversals reported

Leakage

0% deduction; justification contradictory across documents

Baseline

Project-specific; no reassessment date; under-delivery questions validity

Safeguards

FPIC and grievance mechanism present; no-net-harm and consultation gaps flagged

Double-claim

CORSIA and CCP status not stated; double-counting with constructors flagged

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03VM0039

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents