REDD+ Project Magnolios de Yarumal
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using a barrier test, which supports the project’s additionality case.
verified Leakage is treated with a quantified 15% deduction and the project has a 22% buffer pool, but reversal events are not addressed in the extracted record.
Transparency
verified The monitoring period is stated as 2016-02-23 to 2020-10-23, and the VVB is identified as Ruby Canyon Environmental, Inc.
missing Key MRV fields such as total credits claimed versus verified, usage monitoring method, and CORSIA status are not stated in available documents.
Claim Safety
verified A quantified leakage deduction and a project-specific baseline reduce some over-crediting risk.
missing The baseline was project-specific rather than jurisdictional, and the contradiction on leakage justification creates some reliability concern.
Documentation
verified The record includes multiple official-document extracts and names the VVB, methodology, monitoring period, and crediting period.
missing Extraction confidence is only medium, and the verification package triggered many corrective action, documentation, and clarification requests.
Detailed Analysis
Integrity
The project has meaningful positive integrity signals: the VVB confirmed additionality through a barrier test, the leakage deduction is quantified at 15%, and a 22% buffer pool is in place. At the same time, reversal risk is not clearly addressed in the extracted record, and the baseline is project-specific rather than recently reassessed. These factors keep integrity above average but not strong.
Transparency
Transparency is mixed. The monitoring period and VVB are identified, but the extracted record does not state total credits claimed or verified, the usage monitoring method, or any CORSIA eligibility. The absence of these core MRV details limits public traceability and makes the documentation less transparent.
Claim Safety
Claim safety is moderate because the project uses a quantified leakage deduction and a project baseline, which are better than an unqualified claim. However, the baseline is not jurisdictional, and the contradiction on leakage treatment means the evidence trail is not fully consistent. With CORSIA and CCP status not stated, dual-market claim risk cannot be ruled out.
Documentation
Documentation quality is weakened by the large number of corrective action requests, additional documentation requests, and clarification requests in the verification process. The extraction confidence is medium, and several important fields are missing from the available record. The project is documented enough to assess, but not cleanly or comprehensively.
Overall
I privileged the later document on leakage because it is more recent and more specific, so I treated leakage as quantified rather than not addressed; however, the contradiction still lowers confidence. The project’s overall profile is moderate: it has some strong safeguards and integrity features, but the documentation burden, missing MRV details, and unresolved reversal treatment prevent a higher score. The post-scoring gate on documentation would not materially improve transparency here because the documentation score is already below strong levels, and integrity remains above the cap threshold.
Audit Analysis
This REDD+ project shows some solid integrity features, including VVB-confirmed additionality, a quantified leakage deduction, and a 22% buffer pool. However, documentation quality is weakened by many corrective action and clarification requests, missing key monitoring details, and a contradiction on whether leakage was addressed in earlier versus later documents. Overall, the project looks moderately credible but not low-risk.
Project Description
Proponent: Multiple Proponents Protocol categories: Agriculture Forestry and Other Land Use Protocols: VM0015 Estimated annual GHG reductions: 329260 tCO2e Region: Latin America Registration date: 2023-12-05
Red Flags
- The verification package required 15 corrective action requests, 8 additional documentation requests, and 30 clarification requests, which signals material documentation weaknesses.
- A contradiction exists on leakage treatment: an earlier document said leakage was not addressed, while a later document says it was quantified; the later, more recent source was privileged, but the inconsistency still reduces reliability.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 2,468 | 2,468 | 0 | |
| 2017 | 2,671 | 2,656 | 15 | |
| 2018 | 2,602 | 946 | 1,656 | |
| 2019 | 2,677 | 588 | 2,089 | |
| 2020 | 3,647 | 2,912 | 735 | |
| Total | 14,065 | 9,570 | 4,495 |
Cosa migliorerebbe questo punteggio
- Publish a complete verification and monitoring package with verified versus claimed issuance, usage monitoring details, and a clear statement on CORSIA and CCP status.
- Resolve the leakage and permanence evidence gaps by documenting the final leakage rationale, any reversal monitoring, and how corrective action requests were closed.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed barrier test
buffer pool present, reversal treatment unclear
quantified 15% deduction
project baseline, reassessment not stated
FPIC and grievance mechanism documented
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →