Reduction of GHG emission by energy efficient led lights installation in Ghaziabad Nagar Nigam

VCS-4477 ↗

#850of 975 in India#1114of 1339 in Verra (VCS)

4.2/ 10
Integrity
3.8
Transparency
4.5
Claim Safety
4.2
Documentation
4.5

Audit Analysis

This LED street-lighting project under VCS AMS-II.L is registered and uses a standardized methodology, but the validation report surfaces an unusually high number of material findings (11+ issues, 6 CARs, 8 CLs), including a net-to-gross calculation error, an incomplete additionality cost analysis, and a commenter challenge to the project's financial viability. Six contradictions between the PDD and validation report — including conflicting FPIC status and crediting periods — further erode confidence in the data integrity. The project is low-risk on permanence and leakage grounds (non-AFOLU, LED replacement), but the documentation and claim-accuracy issues are material.

Red Flags

  • Eleven or more material findings in the validation report, including a net-to-gross adjustment error in GHG calculations and errors in ex-ante ERR values (OFi,y and Qi,p)
  • Commenter challenged financial viability, reporting a loss of INR 1,200 per bulb installation and questioning how the project operated from Dec 2021 to Aug 2023 without revenue
  • Six contradictions between the PDD and validation report, including conflicting FPIC status (PDD: conducted; validation: not conducted) and conflicting crediting periods
  • Usage monitoring method is 'assumed' rather than measured, and the monitoring period is not stated in the extracted record
  • Additionality assessment flagged as incomplete with a missing simple cost analysis and regulatory surplus demonstration

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Investment test VVB-confirmed but cost analysis incomplete; financial viability challenged

Permanence

Non-AFOLU project; no inherent reversal risk

Leakage

0% deduction; deemed negligible — appropriate for LED replacement

Baseline

Project-specific baseline; reassessment timing not stated

Safeguards

Grievance mechanism present; FPIC status contradicted between PDD and validation report

Double-claim

CORSIA and CCP status both not stated; dual-channel risk not excluded

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03AMS-II.L

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents