Skip to main content
VCSAgriculture Forestry and Other Land UseBrazil Registry: RegisteredAR-ACM0003

Reflorestamento de Impacto no Brasil Project

VCS-4430 ↗

#151of 261 in Soil carbon#136of 211 in Brazil#1013of 1339 in Verra (VCS)#59of 97 in AR-ACM0003

4.5/ 10
Integrity
5.2
Transparency
3.5
Claim Safety
4.5
Documentation
4.5

Audit Analysis

A 40-year Brazilian reforestation project (AR-ACM0003 v2.0) validated by AENOR with a combined additionality test and a 10% non-permanence buffer. The validation report identified 11 material findings and 11 corrective actions — all reportedly closed — but the project-specific baseline, a 0% leakage deduction with an initially incomplete justification, and a 33% discrepancy in lifetime ERR between the PDD and the validation report leave meaningful uncertainty. No monitoring reports or verified emission-reduction figures are available, so all claims remain untested against observed performance.

Red Flags

  • Lifetime ERR differs by 33% between the PDD (8,602 tCO₂e, Jul 2023) and the validation report (11,490 tCO₂e, Dec 2024); the basis for the increase is not explained in the extracted record.
  • Leakage deduction is 0% on the basis of 'deemed negligible' displacement, yet the validation report flagged an incomplete leakage justification as a material finding.
  • Eleven material findings and eleven corrective actions were raised during validation, including incomplete demonstration of additionality, baseline scenario, No Net Harm safeguards, and methodology applicability.
  • No monitoring reports, verified ERR figures, or monitoring-period data are available in the extracted record; all emission-reduction claims are unverified.
  • CORSIA eligibility and CCP status are not stated in any available document.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-verified combined test, but flagged as incompletely demonstrated

Permanence

10% buffer applied, no reversals reported, but risk scores initially insufficient

Leakage

0% deduction, 'deemed negligible' justification initially found incomplete

Baseline

Project-specific baseline; reassessment not yet due under 10-year VCS rule

Safeguards

FPIC and grievance mechanism present, but No Net Harm / AFOLU safeguards flagged insufficient

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09AR-ACM0003

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents