Skip to main content
VCSAgriculture Forestry and Other Land UseColombia Registry: RegisteredAR-ACM0003

Restoration of degraded areas and reforestation in Cáceres and Cravo Norte, Colombia

VCS-576 ↗

#189of 261 in Soil carbon#111of 124 in Colombia#1147of 1339 in Verra (VCS)#77of 97 in AR-ACM0003

4.1/ 10
Integrity
3.5
Transparency
4.5
Claim Safety
4.0
Documentation
4.8

Audit Analysis

This Colombian reforestation project (VCS-576) has a verified additionality test and a 27% buffer pool, but suffers from a severe loss event (54,670 tCO₂e, representing 22% of prior carbon stocks) caused by illegal mining, the complete exclusion of the Cravo Norte site due to plantation failure, and an extensive list of material findings and corrective actions. The project delivered only about 42% of its pro-rata ex-ante expectation for the 2014–2021 monitoring period, and the leakage justification shifted from a quantified deduction in 2015 to 'deemed negligible' in 2023 without clear reconciliation. Overall, the project's integrity and claim safety are materially compromised by the permanence loss and documentation inconsistencies.

Red Flags

  • Loss event of 54,670 tCO₂e (22% of prior verified carbon stocks) due to illegal mining and deforestation; the project proponent failed to report this within the required timeline
  • Cravo Norte site — named in the project title — was entirely excluded from verification because plantations failed, reducing the effective project area
  • Leakage deduction changed from a quantified value in the 2015 verification report to 0% 'deemed negligible' in the 2023 report, with no clear reconciliation of the change
  • Ex-ante lifetime estimate revised downward by approximately 25% (from 1,054,854 to 791,808 tCO₂e) between the 2015 issuance and the 2023 verification
  • 12+ corrective actions and 15+ material findings identified in the 2023 verification, including missing loss-event demonstration, incorrect KML boundaries, and unexplained methodology change from AR-AM0005 to AR-ACM0003

Credit Vintages

IssuedRetiredAvailable
2002
7,1347,1340
2003
7,1347,1340
2004
7,9757,9750
2005
9,6259,6250
2006
16,94116,9410
2007
19,45519,4550
2008
20,31720,3170
2009
20,16020,1564
2010
20,16020,1600
2011
63,80462,5441,260
2012
63,98163,9756
2013
63,90963,651258
2014
46,39946,30594
2015
11,37811,3780
2016
11,37811,3780
2018
11,0289,2351,793
2021
3,7288512,877
Total404,506398,2146,292

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Loss event: 22% carbon stock lost to illegal mining

Leakage

0% deduction, deemed negligible; inconsistent with 2015 quantified value

Baseline

Project-specific baseline; reassessment timing not stated

Safeguards

FPIC, grievance mechanism, and benefit sharing documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09AR-ACM0003

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents