Skip to main content
CFCUrban Forest CarbonUnited StatesGeneral Methodologyv2.1

Richland County Forest Carbon Offsets

CFC-richland-county-forest-carbon- ↗

#68of 345 in United States#34of 59 in City Forest Credits (CFC)

6.0/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.0
Documentation
6.0

Audit Analysis

A 94-acre urban tree preservation project in Ohio under the City Forest Credits standard, with a 40-year crediting period and a 10% reversal pool. Additionality is confirmed by the VVB via a combined test, and no reversal events were reported during the first monitoring period. Key gaps include a project-specific baseline, an unspecified leakage deduction percentage, and the absence of FPIC and grievance mechanism documentation.

Red Flags

  • Leakage is described as 'quantified' in the verification report but no specific deduction percentage is stated in the extracted record, making it impossible to confirm the magnitude of the adjustment.
  • The baseline method is project-specific rather than jurisdictional or standardised, and the date of the last baseline reassessment is not stated in any available document.
  • FPIC and grievance mechanism details are not found in the extracted record despite safeguards being broadly mentioned, leaving community engagement and rights protections unverified.

Credit Vintages

IssuedRetiredAvailable
2023
6,7574,2502,507
Total6,7574,2502,507

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

Quantified but deduction % not stated

Baseline

Project-specific, reassessment date unknown

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents