Skip to main content
VCSAgriculture Forestry and Other Land UseColombia Registry: RegisteredVM0006

Rio Pepe y ACABA REDD+ Project

VCS-1396 ↗

#198of 261 in Soil carbon#116of 124 in Colombia#1166of 1339 in Verra (VCS)#10of 10 in VM0006

4.0/ 10
Integrity
4.0
Transparency
3.5
Claim Safety
5.0
Documentation
3.0

Audit Analysis

The Rio Pepe y ACABA REDD+ project has a verified additionality test and a 20% quantified leakage deduction, but is undermined by an extensive list of nonconformities (29 VCS NCRs, 21 CARs), a 5-year gap between the monitoring period and verification, a project-specific baseline, and a significant longevity risk (30-year financial plan versus 60-year legal commitment). The project over-delivered relative to its pro-rata ex-ante expectation, which is positive for claim safety, but the internal contradiction between the stated 'quantified' leakage justification and the material finding of no market-leakage calculation weakens confidence in the integrity of the credit.

Red Flags

  • 29 VCS nonconformity reports and 21 corrective action requests were raised during verification, indicating systemic documentation and implementation gaps
  • Project longevity risk scored 15: the 30-year financial plan does not cover the 60-year legal commitment, creating a material permanence gap
  • Fire, pest, and geologic risks were scored 0 with no mitigation measures implemented, despite the project being in a flood- and landslide-prone area in Colombia
  • The 2024 verification report states leakage is 'quantified' yet a material finding explicitly notes 'No calculation and assessment of market leakage' — an internal contradiction
  • The CCB verification public comment period was not conducted prior to verification, a procedural compliance gap

Credit Vintages

IssuedRetiredAvailable
2014
18,5488,5999,949
2015
201,745201,7450
2016
175,579175,5790
2017
171,41488,78382,631
Total567,286474,70692,580

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Buffer pool present but longevity risk and unmitigated hazards

Leakage

20% deduction stated but market-leakage calculation missing

Baseline

Project-specific baseline; reassessment not yet due under VCS 10-yr rule

Safeguards

FPIC, grievance mechanism, and benefit sharing documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09VM0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents