Skip to main content
VCSAgriculture Forestry and Other Land UseColombia Registry: RegisteredVM0007

Riscales REDD+ Project

VCS-1806 ↗

#62of 261 in Soil carbon#40of 124 in Colombia#551of 1339 in Verra (VCS)#5of 27 in VM0007

5.3/ 10
Integrity
5.0
Transparency
6.0
Claim Safety
4.5
Documentation
6.0

Audit Analysis

The Riscales REDD+ project in Chocó, Colombia has a VVB-verified additionality assessment and a 12% buffer pool with no reported reversals, but a serious contradiction between the 2024 PDD (15% leakage deduction) and the 2025 validation report (0% leakage) undermines confidence in the leakage treatment. The project delivered roughly 62% of its pro-rata ex-ante expectation for the elapsed monitoring period, which is conservative, yet three open Future Action Requests—including a double-counting assessment—remain unresolved. Overall, the project shows moderate integrity with notable data-reliability concerns.

Red Flags

  • Leakage deduction dropped from 15% in the 2024 PDD to 0% in the 2025 validation report, with the justification shifting from 'not addressed' (2018 PDD) to 'quantified' (2025 validation)—a material and unexplained change in a high-deforestation-risk region (Chocó, Colombia).
  • Three Future Action Requests remain open, including a requirement to assess the evolution of jurisdictional REDD+ programs in Chocó to rule out double-counting (FAR3) and to geolocate subtracted areas (FAR2).
  • Lifetime ex-ante ERR was reduced from 5,617,196 tCO₂e (2018 PDD) to 3,099,560 tCO₂e (2025 validation), a 45% downward revision that warrants scrutiny of the underlying assumptions.
  • Baseline is project-specific and the date of last reassessment is not stated in any available document; the 2023 verification report lists a corrective action to 'reassess and validate baseline for the period after 1 April 2020,' suggesting the reassessment may still be pending.

Credit Vintages

IssuedRetiredAvailable
2014
47,92755047,377
2015
63,902063,902
2016
63,902063,902
2017
24,269024,269
Total200,000550199,450

Risk Indicators

Additionality

VVB-verified combined test

Permanence

12% buffer, no reversals

Leakage

0% vs 15% contradiction

Baseline

Project-specific, reassessment pending

Safeguards

FPIC, grievance, benefit sharing

Double-claim

CORSIA/CCP not stated; FAR3 open

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09VM0007

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents