Skip to main content
CFCUrban Forest CarbonUnited StatesGeneral Methodologyv2.1

Rockford Township Forest Carbon Offsets

CFC-rockford-township-forest-carbo ↗

#11of 389 in United States#5of 59 in City Forest Credits (CFC)

6.8/ 10
Integrity
7.0
Transparency
6.5
Claim Safety
6.5
Documentation
7.0

Audit Analysis

A CFC-standard urban forest preservation project with a verified barrier additionality test, a quantified 18.3% leakage deduction, and a 10% reversal pool. The project is well-documented with no material findings, though the project-specific baseline and several unreported MRV details (FNRB method, usage monitoring) limit confidence in the full MRV chain. The 40-year permanence claim is supported by the buffer pool but remains a long-term risk.

Red Flags

  • Project-specific baseline rather than a jurisdictional or standardised reference, limiting comparability and increasing sensitivity to local assumptions
  • FNRB method and value not stated in any available document, leaving the forest net regeneration baseline unverified
  • Contradiction between the verification report (reversal events 'not addressed') and the validation report ('none reported') creates ambiguity about whether the reversal risk was explicitly evaluated during verification

Credit Vintages

IssuedRetiredAvailable
2024
3,85403,854
Total3,85403,854

Risk Indicators

Additionality

VVB-verified barrier test

Permanence

40-yr claim, 10% pool, no reversals yet

Leakage

18.3% quantified deduction

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents